Groundwater
An Endangered Resource
This proceedings, Groundwater: An Endangered Resource, contains papers presented at the 27th Congress of the International Association of Hydraulic...

Guidelines for the Design of Double-Layer Grids
Prepared by the Task Committee on Double-Layer Grids of the Committee on Special Structures of the Structural Engineering Institute of ASCE. This report...

John F. Kennedy Student Paper Competition and Specialty Seminar Summaries
This proceedings, John F. Kennedy Student Paper Competition and Specialty Seminar Summaries, consists of papers presented at the 27th Congress...

Managing Water
Coping with Scarcity and Abundance
The proceedings, Managing Water: Coping with Scarcity and Abundance, consists of papers presented at the 27th Congress of the International...

Structural Design of Closure Structures for Local Flood Protection Projects
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers, No. 21 This guide provides a framework for the structural...

Water for a Changing Global Community
This six-volume collection contains the papers presented at the 27th Congress of the International Association of Hydraulic Research on Water for a Changing Global Community. The Proceedings...

Waterpower '97
This proceedings consists of papers presented at the Waterpower '97 specialty conference. This international conference on hydropower was held in Atlanta, Georgia, August...

Aircraft/Pavement Technology
In the Midst of Change
This proceedings, Aircraft/Pavement Technology: In the Midst of Change, includes papers presented at the 1997 Airfield Pavement Conference...

Guidelines for Retirement of Dams and Hydroelectric Facilities
Prepared by the Task Committee on Guidelines for Retirement of Dams and Hydroelectric Facilities of the Hydropower Committee of the Energy Division of ASCE. ...

Infrastructure Condition Assessment
Art, Science, and Practice
This proceedings contain papers presented at a conference sponsored by the Facilities Management Committee of the Urban Transportation Division of the American Society of Civil Engineers...

Historic Upgrades in San Francisco
The 1989 Loma Prieta earthquake seriously damaged many of the historical buildings that compose the San Francisco Civic Center complex. As the complex serves as a critical cultural and...

Old Aswan Dam
Egypt's Aswan Dam is almost 100 years old, and engineers performed tests of the masonry, conducting petrographic and chemical analyses. The High and Aswan Dam Authority of...

Seismic in St. Louis
Following collapse of sections of the double-deck I-880 Cypress Viaduct in the 1989 Loma Prieta earthquake, the Missouri Department of Transportation initiated a seismic evaluation and...

Underwater Magic
Applications of geomembrane systems to arrest concrete deterioration and control leakage in hydraulic structures have been accomplished, with a few exceptions, in a dry environment by...

A Bridge for the 21st Century
The authors write about the cable spinning process used in the Great Belt East Bridge project in Denmark. The bridge, when completed, will be the largest suspension bridge in the world....

New Uses for Old Bridges
As historic bridges age, they are often rendered useless by modern load requirements and codes. Many had been abandoned or demolished. In 1991, however, the ISTEA created new provisions...

The Rebirth of a Station
Engineers are almost through with the $175 million renovation of Grand Central Terminal in New York. The job required a sensitive cleaning job, attention to historical detail, and most...

Nature's Payback (Available in Geoenvironmental Engineering Special Issue)
Environmental compensation is now a major concern for utilities and other developers who must compensate for impacting wetlands, streams and other environmentally-sensitive areas. To meet...

Thai Water Mark
Thailand's economy has taken off and with new industry and population growth, water quality problems are increasing. The nation has a 20-year initiative to address these problems,...

Grouting Pains (Available in Geoenvironmental Engineering Special Issue)
The article focuses on a new grouting technique for filling holes drilled during site investigation. The holes are grouted as the drill is withdrawn from the hole, instead of filled later....

 

 

 

 

Return to search