Grid Requirements for Numerical Models Containing Training Works
The numerical modeling of the rapid changes in flow variable in open channel flow systems containing training works, such as dikes, requires special attention in grid development. This...

High-Resolution Two Dimensional Advective Transport
The paper describes a two-dimensional high-resolution scheme for advective transport that is based on a Eulerian-Lagrangian method with a flux limiter. The scheme is applied to the problem...

Numerical Prediction of the Turbulent Flow with a Free Surface for 3-Dimensional Situation
An efficient finite-difference method, the HH-SIMPLE, has been developed that is based on a new concept of hydraulic pressure with two additional equations concerning the water surface...

Far-Field Numerical Model Studies for Boston's New Secondary Treatment Plant Outfall Siting
By the late 1900s, Boston is scheduled to have built a new secondary treatment plant that combines the waste streams from two existing plant, and discharges the resulting liquid effluent...

Infiltration Trenches for Urban Runoff Control
A two-dimensional finite element model has been developed to simulate the transient flow in a variably saturated porous medium for the study of infiltration trenches. Parameters such as...

UNET: A Model of Unsteady Flow Through a Full Network of Open Channels
UNET is a PC-based dynamic wave, unsteady flow model for the solution of the full network problem. The program applies a linearized implicit finite difference scheme to solve the full...

Important Aspects of Annual Energy Calculation Techniques for Low Head Hydro Power Plants
Annual energy calculations are frequently used to optimize design parameters at a turbine site and to compare energy production based on equipment offers from various suppliers. In this...

Tunneling through an Existing Concrete Masonry Dam
The Gregory B. Jarvis Hydroelectric Project is located in Upper New York State on the West Canada Creek. Existing facilities include a non-overflow concrete gravity dam, 65 feet long and...

Cofferdams: An Integral Part of Small Hydro Design
Cofferdam construction costs can be a major factor in the viability of a small hydro development. For this reason, cost-effective design and construction are critical. A cost-effective...

Flashboard Alternatives Including Rubber Dams
This paper reviews some common flashboard methods used in the northeastern part of the U.S., and discusses the advantages and disadvantages of each type. The inflatable rubber dam is presented...

FERC's Experience in Analyzing Cumulative Impacts
Since the mid-1980's, the Federal Energy Regulatory Commission (Commission) has assessed cumulative impacts associated with developing proposed hydropower projects. A brief...

Vibration Problems of Penstock Piping for a Vertical Tubular Hydraulic Turbine
Excessive vibration amplitudes were experienced in the vertical gated tubular units at the Great Falls Hydroelectric Project located in the City of Paterson, New Jersey. Vibration amplitude...

Upgrading Open-Wheel Pit Hydro Plants with Modern Submersible Hydroturbines
This paper presents a new approach in rehabilitating open-wheel hydrosites by using modern, standard submersible hydroturbines, open flume type cylinder gates, and high efficiency draft...

Planning and Operation of Hydropower Development on a Navigation System, a Case Study
This paper examines the steps taken to optimally develop the hydropower plant at Lock and Dam No. 13 on the Arkansas River as part of an existing multiple use system. The specific items...

Turnkey Hydropower at St. Cloud
The St. Cloud Hydroelectric Project is located at an existing dam on the Mississippi River in St. Cloud, Minnesota. The project consists of a two-gated spillway and an 8.6-megawatt powerhouse...

Paradise River, a Challenging Small Hydro Development
The frequent assumption that small hydro developments are simple is not always borne out in practice. A case in point is the Paradise River Development in Newfoundland, Canada. This paper...

Harnessing the Snake: A Construction Viewpoint
The Gem State Hydroelectric Project, five miles south of Idaho Falls, Idaho on the Snake River, consists of a 900-foot-long, 40-foot-high dam; approximately four miles of earthend dikes;...

SPIDA Method for Reinforced Concrete Pipe Design
The required supporting strength of buried pipe is affected by the total load that is imposed upon the pipe and the manner in which the pipe is supported by the surrounding soil. The installation...

Reliability Analysis of Water Distribution Systems
Prepared by the Task Committee on Risk and Reliability Analysis of Water Distribution Systems of the Committee on Probabilistic Approaches to Hydraulics of the Hydraulics Division of ASCE....

Avoiding and Resolving Disputes in Underground Construction
Successful Practices and Guidelines
A method of developing cooperative, problem-solving attitudes on projects through a basic risk sharing philosophy between owner and contractor is presented. Special contracting provisions...

 

 

 

 