Facilitate Delay Claim Analysis with As-Built Schedule Databases
A computer-based As-Built Schedule Database can provide a useful tool for the investigation of project performance. The facts recorded in the database may be used to identify actual sequential...
The Use of SCADA for Real-time Calculation and Monitoring for CT Compliance at the Ralph D. Bollman Water Treatment Plant
The contra Costa Water District (CCWD) of Concord, CA was formed in 1935 under the authority of the State Water Code. CCWD purchases its water supply from the Central Valley Project (CVP),...
Contemporaneous Development of Field Data: Transportation Construction Claim Defense
This paper addresses the continuing development of a construction field database system documenting resources applied on the jobsite by Contractors. The paper focuses on the case study...
Computer Use in Claims Analysis -- Roundtable Discussion
Preparation or defense of construction claims is inherently time consuming and often counter-productive. This outline discusses some tools currently used in the construction industry to...
CadVisor (CAD Equipment Analysis and Selection System)
This paper describes a system called CadVisor (CAD Equipment Analysis and Selection System) developed by the U.S. Army Corps of Engineers Construction Engineering Research Laboratories...
Practical Approach to Cope with Construction Cost Uncertainty in an Inflationary Environment
There are actions suggested to mitigate the risk in costs caused by an inflationary economy, such as escalation clauses and including price contingencies in the bid . This paper presents...
Management Information System Application on a Multi-Million Overseas Project
Project Management Information Systems (PMIS) provides improved data quality, consistency, timeliness, and reporting flexibility and improved project teamwork. Project managers have a...
A Knowledge-Based Computer System for Financial Wind Risk Management
This paper presents the results of a sponsored applied research project conducted by a multi-disciplinary team to integrate state-of-the-art methods in wind and collateral (e.g., surge,...
The Integrated Systems Approach to Facilities Management
This paper investigates the condition and use of the systems for facilities management and discusses process and considerations for improving the long term value of integrated facilities...
Methods to Reduce the Settlement of Embankments on Soft Clay: A Review
New trends have been observed during the past ten years in the practice of settlement control for embankments on soft clays: they include increased use of rigid (piles) or semi-rigid (stone...
Displacement of Landmark Building Resulting from Adjacent Construction Activities
This paper describes the observations and presents comments related to the measurement of settlement and the avoidance of damage to a historic structure in the City of New York from adjacent...
Performance of Nanhua Dam During Construction
The pore pressure response and settlement during the construction of Nanhua dam were studied by several methods, including Hilf's method, laboratory stress path simulation and numerical...
Dynamic Compaction of Landfill Beneath Embankment
This paper presents the results of a highway project where dynamic compaction was used to densify a closed landfill prior to constructing highway embankments over the landfill. The purpose...
Finite Strain Consolidation for Vertical Drains
Consolidation equations for vertical prefabricated drains which consider finite vertical strain of the soil are derived. Estimated consolidation times are shorter when finite soil strain...
Performance of a Steel Tank Founded on a Marine Clay
For tanks on soft clays, the soil is often preloaded before tank construction to increase bearing capacity and minimize post-construction settlement. In the case history described here,...
Numerical Modeling of Bridge Approach Settlement with Foundation-Embankment Interaction
Bridge approach settlement is one of the major problems facing the transportation agencies responsible for road construction and maintenance in the United States and in many other countries...
Vibration Induced Settlement From Blast Densification and Pile Driving
This paper describes settlement and vibration environments produced by two construction activities, blast densification and pile driving. Blasting is of interest because of the significant...
Federal Risk Management Policy: Where Are the Problems?
Federal risk management policy involves both risk assessment and risk management elements. Risk assessment consists of hazard identification, dose-response assessment, exposure assessment,...
When and How Can You Specify a Probability Distribution When You Don't Know Much?
This paper presents an excerpt from the proceedings of the above-named workshop, and gives an overview of both the workshop and the proceedings. Five papers with diverse and complementary...
Methods for Risk and Reliability Analysis
Recently, there has been considerable emphasis on the state of decay in the nation's infrastructure because of its importance to society's needs and industrial growth. Water distribution...