Lifetime Behavior of Wood Structural Systems
Reliability based design of wood structural systems requires knowledge about the lifetime behavior of the system. The 50 year lifetime behavior of wood floors and flat roofs was examined...

Development of a Safety Assessment System for Steel Bridge Erection Work
In order to secure safe execution of steel bridge erection work, development of a comprehensive checking system to set up safety countermeasures at the stage of construction planning prior...

Towards Reduction of the Vulnerability of Multi-Tank Storage Facilities
Accident scenarios in large scale industrial plants show that conventionally designed multi-tank storage facilities are susceptible to domino effects. With the aim to reduce the probability...

Comparison of a Practical Fragility Analysis of a Reactor Building with Non-Linear Monte Carlo Simulation
There are several conventional methods to assess seismic safety of nuclear power plants practically. In these methods, non-linear effect of the structural elements is considered with an...

A Plant for All Seasons
Collins, Eckley and Detweiler describe a successful energy conservation program at the Willow Lake Wastewater Treatment Plant, Salem, Ore. By funding the $4.59 million project with a combination...

The Prefab Tunnel
Jacking a prefabricated concrete arch through a railroad embankment to provide a new access ramp to the Don Valley Parkway in Toronto was done for the first time in North America. In September...

Chicago's Loop: A New Approach
Reconstruction of the Wells St. Viaduct cleaned up a dangerous area just north of Chicago's Loop by providing a structurally sound approach for CTW commuter trains and a column-free...

One Power Plant, Two Job Sites
In response to the lingering questions about energy, officials from Vidalia, La initiated a plan in 1977 to build a hydroelectric plant at a site 90 mi northwest of Baton Rouge, where...

A Doubling Design: Rochester's Expanding Airport
Few projects offer greater design challenges or pose more critical construction complexities than a new air passenger terminal, especially when that new terminal must be built on land...

HELP is on The Way
Hill and Davies describe current progress on the development of a Heavy Vehicle Electronic License Plate (HELP) system in the United States. The HELP system concept combines automatic...

Industrial Strength 3-D
Williams assesses the benefits of using three-dimensional computer modeling in the design of industrial structures, comparing the reality in which the computer is a useful tool for engineers...

Monitoring Vibration
Vibration monitoring for construction projects is increasing rapidly. Instrumentation for measuring structural response to blasting began in the mining industry with research by the U.S....

Advances in Pipeline Materials and Design in Europe and North America
This paper presents an overview of various developments in materials technology and design procedures in the Western Hemisphere over the last 20 years. Some projections for anticipated...

Recent Advances in Structural Rehabilitation Techniques for Underground Sewer Pipelines
A great challenge for the coming years, if not decades, will be the repair, renovation and renewal of the existing sewerage systems in the Federal Republic of Germany in the interest of...

The NOVA SPAN Bridge System
The NOVA SPAN Bridge concept provides the basis for the design and construction of a new variant in the field of bridges and culverts which, in its performance and operation, incorporates...

Advances in Trenchless Sewer System Reconstruction
The new developments and refinements in trenchless reconstruction technologies now permit total sewer system rebuilding of collectors, interceptors, manholes, service laterals, and force...

Whatever Happened to Long-Term Bridge Design?
The Chairman of the Board of one of the leading engineering firms in the nation ponders the future of American bridges. In today's designing of bridges, Thomas R. Kuesel points...

Whitfield Reservoir Inlet Outlet Pipeline
Alameda County Water District reports on the planning, design and construction of a 48-inch water main installed under modern urban circumstances. The location of the pipe and the construction...

Pipeline Design and Construction Using High Density Polyethylene (HDPE) Pipe
All pipelines and pipe materials must be designed and constructed to address the limitations of the pipe and fittings in order to insure acceptable performance of the line. Conventional...

A Look Back in Time to Verify Life Cycle Cost Analyses
The proper engineering design of any hydraulic structure requires consideration of different but interrelated fields of: 1) Planning, 2) Hydrology, 3) Hydraulics, 4) Structural, 5) Installation,...

 

 

 

 

Return to search