Unique Features of Automated People Mover Systems
This paper identifies the characteristics and unique features of the automated transit system presently being installed in the central business district of Detroit, Michigan. This system...

Human Interface Design of an APM Control Center
The control center of an Automated People Mover (APM) system is a man-machine system. Both software and hardware aspects of the design of the monitor room that directly affect ease of...

Detroit's DPM Maintenance and Control Facility
The Maintenance and Control Facility (MCF), a single building complex for the Detroit Downtown People Mover (DPM) system, incorporates the people mover system's transit vehicle...

Alternative Procedures for Investigating Failures
Failures of engineered structures continue to occur. This is despite rapid advances in engineering theory, new, more sophisticated methods of analysis, and streamlined techniques for preparing...

Failure Information Needs in Civil Engineering
If we are to learn from failures of engineered facilities, failure information must be in a useful form, and it must reach those who can effect improved practice. This paper discusses,...

Ensuring Quality Construction
This paper describes the US Army Corps of Engineers' efforts at procuring quality construction: 1) a three-phase approach (preparatory, initial, follow-up) was developed to...

Avoiding Contractor Disputes During Project Design
The New Jersey Transit Corporation is in the second phase of a billion dollar rebuilding program of its rail system. The first phase, which featured electrification and signal system replacement,...

Avoiding Disputes: The Construction Manager's View
Avoiding and minimizing contract disputes, from the construction manager's (CM) point of view, begins during the preliminary planning and design stages and continues throughout...

Construction Inspection?The Last Line of Defense
Construction inspection, or a quality assurance program, is typically the last line of defense in relation to claims for the constructed project. The quality assurance team should be a...

Analysis of Cracking of I79 Bridge at Neville Island
A large crack was discovered to form in a girder of the I-79 Glenfield Bridge over the back channel of the Ohio River near Pittsburgh on January 28, 1977. A section of the girder containing...

Investigation of Catastrophic Failure of a Premium-Alloy Railroad Rail
In November 1983 an Amtrak train derailed at a speed of 72 mph (115 kph) at Woodlawn, Texas (in the vicinity of Marshall, Texas), resulting in four fatalities and twenty-four serious injuries....

Construction Cost Control
The second edition of Construction Cost Control, the first revision in thirty-three years, has been updated to provide engineers and contractors...

Making Computerized Project Control Systems Work?Background
Control systems can be considered as consisting of five major elements. These are: establish the objective or standard to be achieved-quality, maximum duration, resource utilization, maximum...

Control of the Design Process
Gilbert/Commonwealth, Inc. (G/C) was the architect-engineer for the original design of the Florida Power Corporation (FPC) Crystal River Nuclear Plant, Unit 3 (CR3) and has been involved...

Computer Management Concepts for Student Engineering
This paper presents many of the principles and concepts being taught to engineers of the future concerning their use of computer related activities. For example, from the cost/risk/benefit...

Automation of Booster Pump Stations
Several techniques have been used to automate booster pump stations for irrigation conveyance systems. These pump stations typically must supply pressurized water for a wide range of flow...

Use of Microcomputers in Transportation: Potential, Limitations and Future Trends
An overview is given of the existing programs for microcomputer applications in transportation with emphasis in software for traffic analysis and management. The impacts of the increased...

Management of Microcomputers in PennDOT A Perspective on Managing Training
The Pennsylvania Department of Transportation is in the midst of a 63 million dollar 'Plan to Achieve Leading Edge Status in Electronic Data Processing. ' This...

Transportation Systems Forecasting Using Microcomputer Models
This paper describes the evaluation of six transportation forecasting programs which operate on microcomputers. The evaluation is undertaken from the perspective of a metropolitan planning...

Managing Federal Aid Using Microcomputers
Wisconsin's federal aid for highway improvement is about 225,000,000 annually. The obligation authority (the ability to spend the federal aid) is limited to an estimated 162,000,000...

 

 

 

 

Return to search