Deriving Streamflow Distribution Probabilities
Streamflow distribution probabilities are often involved in the stochastic analysis of water resources systems. Limited by data availability, certain probability terms can hardly be abstracted...

Analysis of Drought Indicators
The Pennsylvania Department of Environmental Resources currently monitors five parameters in its regional water supply management program. These are: (1) accumulated precipitation deficit;...

Drought Analysis in the Ohio River Basin
This study formulates the drought series, including drought occurrence time, duration, and deficit volume by the use of daily streamflows and a tracer level of one-half mean value. The...

Mapping of Drought Status in South Florida
The Water Management District (the District) sets regulations to guide water users in conservation of water use in four phases of drought severity. The District's Governing Board is responsible...

Southeastern Drought of 1986 - Lessons Learned
An interim drought management plan for the Apalachicola-Chattahoochee-Flint (A-C-F) river basin was completed in April, 1985, just in time for testing as the drought developed. Objectives...

Time Base of a Hydrograph
For design projects in water resources, a hydrograph is commonly used to determine the required flood volumes. The time base of a hydrograph is a crucial parameter in such studies, and...

Sell Your Organization on the Seven C's for Effective Microcomputer Management
Managing microcomputer resources within your organization is not always smooth sailing. This paper will highlight seven attributes which an organization would do well to follow for more...

Irrigation Systems for the 21st Century
This book contains papers presented at the ASCE Irrigation and Drainage Division specialty conference, Irrigation Systems for the 21st Century, held in Portland, Oregon, July, 1987. Environmental...

Ground Water Management
This manual is designed to present an outline of groundwater hydrology, the details of planning for groundwater management, and a process of selection and implementation of management...

Resource Mobilization for Drinking Water and Sanitation in Developing Nations
The ASCE International Conference on Resource Mobilization for Drinking Water Supply and Sanitation in Developing Countries was held at the Caribe Hilton Hotel in San Juan, Puerto Rico,...

Sultan River Project Operation Study for the Sultan River Hydroelectric Project
The project will be operated to maximize energy production from the Sultan River within the operational constraints imposed by the water demand for the City of Everett and by the instream...

Lemon Dam Hydropower Project
The Florida Water Conservancy District (District), the entity responsible for the operation of the dam and for repayment of the costs, had been interested in the hydropower potential of...

Town Bluff Dam, Texas: A Federal?Non-Federal Hydropower Partnership
Town Bluff Dam is located in southeast Texas, on the Neches River about 45 miles north of Beaumont, Texas. The dam is one element of the authorized Lower Neches and Angelina Rivers, Texas,...

Construction Management of Small Hydro Projects
A major driving force in the small hydro industry is the corps of private entrepreneurs actively engaged in the development of small hydro projects. While many of these developers are...

Non-Federal Hydropower Development at Federal Facilities
The opportunities are available for meaningful coordination among hydropower developers, consulting engineers, and Federal, State, and local agencies to promote comprehensive development...

The Corps of Engineers' New Hydropower Manual
The Corps of Engineers has recently completed a new Engineering Manual (EM), which outlines procedures used for the evaluation of hydropower projects. It will serve as the basic Corps...

Roller Compacted Concrete and Tunnel Boring Machines?Two Tools for Designers and Planners
Two tools that have come into use fairly recently are roller compacted concrete and tunnel boring machines. These new tools can significantly affect the ability to make new projects cost...

The Diamond Fork Power Development Experience
Federal water development agencies are, to varying degrees, currently seeking financing partnership arrangements with states and other non-federal entities for up-front construction and...

Financing the Town Bluff Hydropower Project
The Town Bluff Dam Hydropower Project is the first new Federal hydropower project to be completely financed by a non-Federal entity where all of the construction funds would be provided...

A Cost-Sharing Alternative for Federal-Private Water Projects
A proposed cost-sharing alternative for financing of a joint Federal-State multipurpose water project is presented. The philosophy of recent and present Federal administrations on non-Federal...

 

 

 

 

Return to search