Ferroresonance & the Snettisham Hydroelectric Project
Key system features of the Snettisham power plant in Alaska will be highlighted along with a discussion of the operational problems encountered due to a ferroresonant condition. The project...

Design Considerations for Radial Key Retrofit
A practise that is becoming more and more common is to retrofit hydro-electric generators with Radial Key Systems. There are significant design considerations that must be made to ensure...

Measurements of Time Lag in Concrete Gravity Dam Foundations
Uplift measurements from eight large concrete gravity dams show that the time lag between an increase in headwater level and a corresponding increase in uplift pressure is insignificant....

B.C. Hydro's Practice for Assessing the Foundations of Existing Dams on Rock
Since the early 1980's B.C. Hydro has carried out dam safety reviews which included 33 gravity and embankment dams founded on rock. The foundations include moderately jointed,...

Foundation Investigations of Concrete Dams
This paper discusses a series of foundation investigations conducted on concrete dams by Pacific Gas and Electric Company. The paper focuses on investigative techniques, equipment, appropriate...

Rocky Mountain Project Seepage Cutoff in Solutioned Limestone
The right abutment of the main closure dam for the Rocky Mountain Project required extensive treatment of deeply weathered shale and solutioned limestone to assure control of seepage and...

Utilizing Wetlands for Stormwater Retention
The design steps an engineer uses to develop natural wetlands to provide flood control while continuing to retain their natural functions will be analyzed. This paper will include a discussion...

The Stabilization of Minidoka Powerplant and Dam
The rehabilitation of structures can pose numerous challenges to the engineer. The structure historical preservation, the benefit cost ratio of the rehabilitation, and the stability of...

Stability Analysis of Gravity Dam Foundations with Horizontal Seams
Determination of the overall factor of safety against sliding is an important aspect in concrete dam design. Limit equilibrium methods have serious limitations. A method for determining...

Uplift Pressures and Strengths for Concrete Gravity Dams
This paper presents an overview of the results of a three year study to compile a database of stability parameters and foundation characteristics for older concrete gravity dams. The database...

Bishop Intake #2 Spillway Modifications: A Case History
This paper covers the history of the events leading to the modification of Southern California Edison's (SCE) Bishop Intake 2 to pass a site specific design flood. From the...

The Replacement of Penstocks at TVA Ocoee II Power Plant
The Tennessee Valley Authority (TVA) replaced the steel penstocks at its Ocoee II power plant near Ocoee, Tennessee. A total replacement was necessary because of severe corrosion on the...

Rehabilitation of the Dams at the Crescent and Vischer Ferry Hydroelectric Projects
This paper reviews the dam rehabilitation design and construction techniques used at the New York Power Authority's Crescent and Vischer Ferry Dams. The following are the...

Outlet Works Modifications at Abiquiu Dam
For the installation of a hydroelectric project at the Corps of Engineer's Abiquiu Dam in New Mexico, outlet works modifications that would not affect the structural integrity,...

Civil Design of the Sidney A. Murray Jr. Hydroelectric Station
This paper addresses the general civil design of the Sidney A Murry Jr Hydroelectric Station with special emphasis on the design requirements of the project's unconventional...

Rocky Mountain Project Conceptual Design of Upper Reservoir
The 9300 acre-foot upper reservoir for the Rocky Mountain Project will be formed by an 80-ft high ring dam with a crest length of 12,800 feet. Sandstone and shale of the Pottsville formation...

Evaluating History?The Edison Sault Powerhouse
The hydroelectric facility owned by the Edison Sault Electric Company at Sault Ste Marie, Michigan was an engineering marvel when it was designed and constructed. This paper explores the...

Avoiding Vibration in Penstocks
One objective of this paper is to indicate the potential sources of pressure pulsations within a hydraulic conduit system and the range of forcing frequencies associated with these sources....

Hydraulic Design and Development of Propeller Replacement Runner for R. H. Saunders
This paper outlines the hydraulic design for the R.H. Saunders replacement runner. The six-bladed propeller runner was numerically optimized based on 3-dimensional flow simulation. After...

Hydraulic Transients in the Operation of Small Hydro Plants
Adequate governing stability is a primary consideration for most large hydroelectric generating units. However, almost all small units installed recently in the United States are intended...

 

 

 

 