Analysis of Operating Criteria: Multiple Lakes at Voyageurs National Park
An overview of lake and river regulation at Voyageurs National Park, which resides on the Minnesota-Ontario border, is given to demonstrate how water policy agreements can work. In 1905...

Water Resources Management Issues Confronting Developing Countries
Water resources planning, development and management in most of the developing and rapidly developing countries have been driven by consumer interest. The rapid urbanization, industrialization,...

Technical and Organizational Constraints on Surface and Groundwater Irrigation in Small-Holder Areas of S. Asia
Variable irrigation supply and the independent character of the S. Asian small-holder combine to present a difficult problem in irrigation management. Attempts to introduce advanced technology...

Monthly Water Balance for Blue Nile River Basin in Ethiopia
The objective of this study was to present existing stream flow data for the Blue Nile River and tributaries within the Blue Nile River basin in Ethiopia and to use that data to provide...

Hydrologic and Structural Considerations for the Initial Filling of Jiguey Dam, Dominican Republic
This paper describes the hydrologic and structural considerations of the initial filling of Jiguey Dam which is locate on the Rio Nizao about 100 kilometers west-northwest of Santo Domingo...

Geothermal and Hydropower Production in Iceland
This paper will first consider the technical aspects of both hydropower and geothermal power production in Iceland. Then the economic consequences of the alternative utilization of these...

Developing an Ecosystem Approach for Restoration of the Bay of Quinte
Author describes the ecosystem approach that has been utilized for the restoration of the Bay of Quinte. Brief description of the study area is presented. Various problems such as bacterial...

Plant Modernization and its Role in the Efficient Use of Water Resources
Engineers and hydrologists alike are challenged with the task of developing hydro projects which satisfy a broad spectrum of criteria. Specific criteria employed by resource agencies and...

Developing a Workable Public Input Process for Aesthetics and Recreational Needs During Hydropower Licensing
Aesthetics and recreation are becoming increasingly important issues during hydropower licensing. A variety of regulations and legislation mandate the protection of instream flows for...

Sno Water Led Coordinated Water System Planning
The designation of a Critical Water Supply Service Area (CWSSA) which leads to Coordinated Water Planning evolved from problems recognized much earlier. Regional water suppliers in Snohomish...

3 Counties Coordinated Water System Plans
The Coordinated Water System Plan (CWSP) process is a state mandated management tool created to get agencies and utilities to jointly address problems of current and domestic/municipal...

A Satellite Water System Program in Snohomish County, Washington
The Snohomish County Public Utility District No. 1 (PUD) has developed a Program for management of small public water systems. The Satellite Water System Management Program (SWSMP) is...

The Department of Health's Role in Implementing the Coordination Act in North Snohomish County
A coordinated water system plan in north Snohomish County resulted in development of uniform minimum design standards, a decrease in the number of new small water systems and regional...

Ecological Considerations in Groundwater Management
A wide variety of potential effects of groundwater management on terrestrial vegetation and aquatic biota are described and illustrated with examples from California....

Coupled Simulation-Optimization Approach to Wellhead Protection Area Delineation to Minimize Contamination of Public Ground-Water Supplies
A loosely coupled simulation-optimization procedure is used to determine the steady-state pumping rates for individuals wells in a multiple well municipal wellfield that result in the...

Assessment of TCE Concentration in South Tucson Water Network
This paper summarizes a study that estimated trichloroethylene (TCE) contamination patterns in a portion of the Tucson water distribution network due to several polluted wells. Aspects...

Groundwater Contaminant Transport at a Hazardous Waste Disposal Site, Pullman, Washington
Groundwater contamination at a hazardous waste site near Pullman, Washington is simulated by a numerical model. The aquifer at the site is classified as an unconfined valley aquifer. Solute...

Investigation and Rehabilitation of the Moses Lake Larson Wellfield
In 1988, low levels of trichloroethylene (TCE) were detected in several of the Larson wells operated by the City of Moses Lake. The wells are up to 800 feet deep and are completed in fractured...

Optimal Strategy for Aquifer Remediation
A methodology for the restoration and cleanup of existing subsurface contaminated sites and for the contaminant of pollutants is developed. The remediation problem is posed as an optimization...

Optimum Operation of Recharge Basins
Mathematical models based on nonlinear programming are developed for operating recharge basin systems. The objective of these optimization models is to determine the operation policy that...

 

 

 

 

Return to search