Operation of Glen Canyon Dam during 1983 and 1984 and the Repairs of Glen Canyon Spillways (
The gates at Glen Canyon Dam were closed in the spring of 1963 and the reservoir did not fill until the summer of 1980. The spillways were tested in 1980 with only slight evidence of operational...
Rehabilitation of the SF Calawah River Bridge
The failure of a 4-span reinforced concrete bridge in Washington State initiated a study that ultimately led to a unique method of bridge rehabilitation. Severe scour resulted in settlement...
The Design of Stays for Cable Stayed Bridges
Much of the R & D work done in the development of details for the modernized form of stayed girder bridges has been contributed by those practicing in the field of prestressed...
Innovative Approaches to Bridge Pier Foundation Design
As a part of a Value Engineering change proposal the pier foundations for the US-31 bridge over the St. Joseph River and floodplain near Niles, Michigan were re-designed. The varying soil...
Evaluation and Surveillance of Concrete Bridge Structures
A number of cost-effective techniques are available for evaluation and surveillance of concrete bridge structures. The methods covered in this paper include: long-term bridge instrumentation,...
Dynamic Behavior of Three J.S. Cable Stayed Bridges
Dynamic considerations in the design of three recently designed cable stayed bridges are discussed. The presentation includes analysis for eigenfrequencies and eigenmodes, assessment of...
Overview--Committee Report on Dam Safety Guidelines
In November 1984 the Surface Water Hydrology Committee appointed a task committee with the assignment to suggest standards for the hydrologic safety design of dams. The committee report...
Criteria for Spillway Design Floods
The procedures outlined in this paper only address the hydrologic safety criteria for spillway design floods. The recommended procedures are based on a careful identification of the social,...
Indemnification Costs in the Dam Safety Decision
The ASCE Task Committee on Spillway Design Floods has proposed safety criteria for three categories of dams. Category 1 dams are those with anticipated failure consequences so large and...
Utility Programs for DWOPER and DAMBRK
Time and computer resources greatly limit potential investigations and sensitivity anslyses. In order to facilitate modeling with the National Weather Service (NWS) programs DWOPER (Operational...
Safety Design Flood for Too Wide Creek Dam
This paper presents an example application of the procedure developed by the ASCE Task Committee on Spillway Design Floods for a dam on the Too Wide Creek. The example was developed from...
Monte Carlo Approach to Spillway Design Floods
This paper shows the use of a daily stochastic streamflow model for the calculation of the hydrograph for spillway design. Most of the literature related to the topic deals with the problem...
Criteria for Selecting a Reservoir Routing Method
Results of an investigation comparing dynamic and storage reservoir routing applied in dam safety analyses are presented. Outflow hydrographs computed by these reservoir routing methods...
Cracking of a Tilt-Up Structure Due to Dynamic Loads
The extensive cracking of a tilt-up reinforced concrete structure is discussed. The site investigation revealed horizontal cracks at two feet to seven feet above a mezzanine level which...
Dynamic Behavior of R/C Buildings in Vi? del Mar, Chile
The Chilean earthquake of 3 March 1985 resulted in an effective peak acceleration of 0. 36g in the coastal city of Vina del Mar. The city had an inventory of over 400 reinforced concrete...
Seismic Decision Analysis for Jackson Lake Dam
This paper presents a framework for decision analysis that can be applied to seismic dam safety problems. The framework provides a means for displaying uncertainties in a manner that allows...
Cyclic Behavior of Concrete-Filled Tubes
This paper presents the results of tests on hollow and concrete-filled rectangular tubes subjected to cyclic bending and buckling. It is shown that concrete infill greatly improves the...
Time-Domain Dam-Reservoir-Interaction Analysis Based on Boundary Elements
For a reservoir with an arbitrary shape of the upstream face and of the bottom including an adjacent regular part of constant depth extending to infinity, the hydrodynamic-stiffness matrix...
Wind Forces Measured on a Tall R.C. Chimney
This paper describes some aspects of an analysis performed on measurements of a variety of parameters relating to the wind, wind forces on and the response of a tall chimney. The results...
Improved Design Procedure for Shallow-Buried Structures to Resist Airblast Loading
Both conventional and nuclear weapons generate airblast loads of sufficient magnitude that structure survival at acceptable cost favors below grade construction. The design of shallow-buried...
Return to search