Daily Diversion Forecasting for a Large Irrigation Project
A procedure has been developed and tested to forecast demand-type large irrigation diversions on a daily basis. The model is based on hydrologic concepts as well as irrigation scheduling...
Farmer Adoption of Irrigation Automation
Farmer acceptance of irrigation automation for water conservation in the eleven Western states is limited. About 29,000 acres, or 0. 1 percent, of the 25 million acres irrigated in these...
High Plains States Groundwater Recharge Program
The Bureau of Reclamation is conducting a 2-phase program to demonstrate the feasibility of recharging declining aquifers in the 17 Western States. The U. S. Geological Survey, Environmental...
Groundwater Recharge Demonstration Projects
In dry climates, natural replenishment rates of aquifers (safe yields) are quite small. Many of these aquifers are being depleted. This is giving rise to an increasing interest in artificial...
Weather Modification Regulation for the Twenty-First Century
Those areas in which weather modification law is being altered to fit the twenty-first century are: 1. De-regulation. Regulation of weather modification through mandating professional...
Feasibility of Weather Modification for California's State Water Project
The California Department of Water Resources (DWR), in the mid 1950's, contracted with some 30 water agencies to eventually furnish about 4. 2 million acre-feet (MAF) of water...
Economic Analysis Tools for Differential Inflation
Economic decisions based on a life-cycle analysis should consider differential increases or decreases in operation and replacement costs and benefits over the project or component life....
The Animas-La Plata Project Cost Sharing Agreement
The United States Congress required a cost-sharing agreement between the project beneficiaries and the Federal government. Under this agreement of June 30, 1986, the project will be constructed...
Future Directions on World Bank Irrigation Projects in India
Irrigation development in India is proceeding at a record rate and will continue for several decades. Experience, however, is showing that future directions must entail substantive emphasis...
Review of the Lake Andes-Wagner Project Sizing
Benefit-cost analyses of the proposed U. S. Bureau of Reclamation Lake Andes-Wagner Project have shown the project to be marginally feasible. In an effort to improve the benefit-cost ratio,...
Project Controls
Needs and Solutions
This volume contains the proceedings of an ASCE Specialty Conference on
Nuclear Waste Disposal: Where Are We?
The U.S. Department of Energy is conducting preliminary site characterizations for three candidates for nuclear waste disposal. The sites are in three different geologic sites. A Richland,...
Optimizing a Minimum Instream Flowby
The Commonwealth of Virginia is currently investigating methods to establish minimum instream flow requirements which may be applied to flow allocations statewide. The Crump Creek Reservoir...
Mesonets--A Solution to Improving Flood Forecasting
Floods continue to cause major destruction annually despite the efforts of Federal water resources agencies. Improved flood forecasts can reduce flood damages and corresponding loss of...
Emerson, Iowa Flood Warning System
A flood warning system was installed in 1985 by the Corps of Engineers at Emerson, Iowa as part of Emerson, Iowa Flood Control Project on Indian Creek. The warning system consists of two...
Shoal Creek Flood Control Plan Austin, Texas
Following the devastating 1981 Memorial Day flood, a comprehensive and innovative flood control plan was developed and implemented for Austin's Shoal Creek Watershed. The...
Multi-purpose Stormwater Detention Facility Completed as First Phase of Englewood, Colorado, Flood Control Project
In 1980 the City of Englewood Urban Renewal Authority proceeded with planning for flood control improvements along Little Dry Creek. The selected plan includes capacity improvements for...
Multiple Parameter Rule Curve for Reservoir Operations
A procedure for deriving operations rules for water supply storage in a multipurpose reservoir, based on physical principles and data analysis, is described. This procedure has several...
Analysis of Drought Indicators
The Pennsylvania Department of Environmental Resources currently monitors five parameters in its regional water supply management program. These are: (1) accumulated precipitation deficit;...
The Dallas Floodway Project
This paper explores the history of the Dallas Floodway project, past performance of the project under various flood conditions, recently updated hydrologic and hydraulic evaluations, and...
Return to search