Layout of a Powerhouse Adjacent to Lock and Dam Structures
An approach flow to a powerhouse intake adjoining existing lock and dam structures may cause a significant reduction in the efficiency of the powerhouse and give rise to an economically...

Generators with Shaft Mounted Turbine Runners
Water turbine runners mounted on an extended generator shaft are often specified to eliminate turbine bearings and the flexible shaft coupling. Two bearing single shaft turbine generator...

Upstream Elbow Tubular Turbines for Low Head Applications
This paper presents standardized Neyrpic tubular turbines for Pontook and ByPass Hydroelectric Projects. Upstream elbow turbines have been selected for those sites. In this paper, the...

Pit-Type Bulb Turbines?An Economic Solution for Low-Head Applications
For improving the profitability of extremely low head power plants the pit-type bulb turbine conception was developed, based on extensive model tests and on the operating experience with...

Optimisation of Bulb and Kaplan Turbine Runners
The paper presents a brief survey of the theoretical method used so far at Turboinstitut Ljubljana for axial runner design and analysis. Theoretically optimised runner is later experimentally...

Hydro Research and Plant Renewal
Obtaining extra energy or output from existing plants is the current topic when the question of refurbishing older turbine installation arises or when plant operating conditions can be...

Bureau of Reclamation Uprating Program
The Bureau of Reclamation is an agency of the Department of the Interior and was established in 1902 to oversee the development and conservation of the Nation's water resources...

Pontook Hydroelectric Project?A Turnkey Case Study
This paper is presented in two parts. The first, presented by B. H. Adams, gives a general overview of the Pontook Project including major physical features and the financed turnkey approach...

Potential for Upgrading the Robert Moses Niagara Power Plant
This paper summarizes the feasibility of increasing the generating capacity of the Robert Moses Niagara Power Plant by replacing the turbine runners, upgrading the generators, and replacing...

The Design of the Nanpil River Hydropower Project
In 1980, the State of Pohnpei (then spelled Ponape) asked the Pacific Ocean Division of the U. S. Army Corps of Engineers to investigate the feasibility of constructing a hydroelectric...

Synopsis of Harry S. Truman Turbine Repair
The Harry S. Truman Powerplant was designed and constructed under the supervision of the U. S. Army Corps of Engineers and is located on the Osage River near Warsaw, Missouri. During 1981...

Development of Three Systems Operated Rev. Pump Turbine
In order to represent the development of reversible, single stage pump turbines in Yugoslavia, the three systems operated pump turbine (3SRPT) of the fourth unit of Moste hydro power plant,...

Computer Aided Design of Butterfly Inlet Valves
Computer simulation of butterfly inlet valves (throughflow, lattice) in hydropower schemes is presented. The software is intended for practisting engineers to obtain significant parameters...

Synchronous Bypass Valves for Hydroplants
The requirement that synchronous bypass valves be provided on most hydroplants and the high cost of suitable valves have created a demand for rebuilt valves. Recently, the Bureau of Reclamation...

Turbine Efficiency Monitoring Utilizing Ultrasonic Flowrate Measurement
On-line turbine efficiency measurement can be achieved by ultrasonic flowrate measurement and state-of-the-art data acquisition techniques. A field performance test program conducted at...

Field Testing: Producing Complete Test Results on Site, A Realistic Objective
Modern technologies and instruments have had an influence in nearly every field imaginable. At Hydro-Quebec, the last ten years have brought about a complete transformation in the way...

Basic Considerations in Governed or Non-Governed Small Hydro Power Plants
This paper reviews the necessary studies and major considerations that must be completed for proper coordination and selection of a turbine governor, and generator. A discussion of the...

Design and Commissioning of the Philadelphia Hydroelectric Project
The Philadelphia Hydroelectric Project consists of a single horizontal-shaft double-regulated S-type unit, rated 3440 kW, utilizing a programmable controller for unit operation together...

Programmable mMicroprocessors in Local Control of Hydro Power Plants
The main purpose of the control equipment is to provide the generator with means for operation of the power station equipment. There is a need for status information on the generating...

An Integrated Site Controller-Network Monitoring System for Small Scale Hydroelectric Sites
Over the past decade more and more small scale hydroelectric power developers have faced the question of the economic feasibility of installing microprocessor based control systems for...

 

 

 

 

Return to search