Comparative WWind Tunnel Testing of Bridge Road Decks
A 1:75 scale full aeroelastic model of the Quincy Bridge over the Mississippi River was tested in the National Research Council of Canada 9 m multiplied by 9 m wind tunnel. Tests were...

Are Soil Moisture Accounting Models Needed for the Real Time Forecasting of River Flows?
The difficulties inherent in using conceptual rainfall-runoff models in conjunction with filtering techniques, for the real time forecasting of river flows, are reviewed. The issue of...

Water Supply Analysis for the Milk River Basin, Montana
The U. S. Bureau of Reclamation's Milk River Irrigation Project provides water for 55,000 ha of irrigation in the Milk River basin of Montana. The project includes an interbasin...

Estimating Firm Yield and Reliability of Small Reservoirs on Ungaged Streams in North-Central Montana
A reservoir-operation algorithm utilizing a sequence of monthly streamflows from a lag-one Markov model is proposed for estimating firm yield and reliability. The reservoir-operation algorithm...

Missouri River Basin Water Accounting System
A water accounting system was developed for the Missouri River Basin to establish an accurate and acceptable base of information describing water availability and uses, and to provide...

Optimizing a Minimum Instream Flowby
The Commonwealth of Virginia is currently investigating methods to establish minimum instream flow requirements which may be applied to flow allocations statewide. The Crump Creek Reservoir...

Mesonets--A Solution to Improving Flood Forecasting
Floods continue to cause major destruction annually despite the efforts of Federal water resources agencies. Improved flood forecasts can reduce flood damages and corresponding loss of...

ENDOW, An Expert System for Screening Environmental Features for Stream Alternations
This paper discusses development of an expert system for Environmental Design of Waterways Projects (ENDOW) by stream alteration specialists who were novices in artificial intelligence....

Feasibility Studies of Flood Warning-Response Plans
Local flood warning-emergency preparedness plans consist of hardware, technical activities, and formal and informal inter- and intra-organizational arrangements and commitments to performance...

Seepage/Drainage Investigation Colusa County California
High groundwater in the late winter months saturates the soil profile, causing damage to both crops and soil. Sustained water logging severely damages or destroys orchards. It has generally...

Overview of a Real-Time Flood Management Model
A flood management model was developed for the operation of the six reservoirs making up the Highland Lakes System on the Colorado River in Texas. The model allows simulation of over 700...

Emerson, Iowa Flood Warning System
A flood warning system was installed in 1985 by the Corps of Engineers at Emerson, Iowa as part of Emerson, Iowa Flood Control Project on Indian Creek. The warning system consists of two...

The Santa Ana River Flood Forecasting System
A real-time flood forecasting and reservoir operations simulation system has been developed for the Santa Ana River Basin, located in southern California. The system consists of generalized...

Flood Forecasting Using Local Resources
A dynamic wave flood routing computer program has been used to develop a flood forecasting model for a 5000 mi**2 watershed in lower Michigan. The modeled area covers over 200 miles of...

Real-Time Hydrologic Modeling
The Huntington District of the Corps of Engineers is currently using daily computer modeling for guidance in regulating all nine of its major river basins. Both pool elevation and flow...

Heppner, Oregon Flood Warning System: An Interagency Cooperative Effort
The flood warning system is a network of event-actuated precipitation and river level gages in two flash flood prone drainage basins of 44 and 6. 8 square mile areas. These basins enter...

Shoal Creek Flood Control Plan Austin, Texas
Following the devastating 1981 Memorial Day flood, a comprehensive and innovative flood control plan was developed and implemented for Austin's Shoal Creek Watershed. The...

Multi-purpose Stormwater Detention Facility Completed as First Phase of Englewood, Colorado, Flood Control Project
In 1980 the City of Englewood Urban Renewal Authority proceeded with planning for flood control improvements along Little Dry Creek. The selected plan includes capacity improvements for...

A Real-Time Flood Management Model for River-Reservoir Systems
A flood forecasting model has been developed for the Lower Colorado River Authority that can be used in a real-time framework to make decisions on reservoir operations during flooding....

Estimating Low-Flow Frequencies of Ungaged Streams in New England
Equations to estimate low flows were developed using multiple-regression analysis with a sample of 48 river basins, which were selected from the U. S. Geological Survey's...

 

 

 

 

Return to search