Port Layout Optimization for Large Bulk Carriers in a Strong Tidal Currents Site
To provide the sheltering conditions of Ponta da Madeira Terminal (TPM) in Sao Marcos Bay, in Sao Luis, Brasil, two rubble mound groins were designed and constructed according to hydraulic...
Effect of Wind on Coastal Construction in Florida
The State of Florida's tidal shoreline is 8,426 miles long. Both the east and the west coast of Florida is subjected to several coastal storms each year. The present study...
Phased Engineering Development and Multiple Agency Review of Public Safety Issues
Several Santa Barbara County agencies have key engineering review responsibilities for new development. The magnitude of issues raised and the level of engineering review required for...
Physical Modelling of Pocket Beaches
The design of artificial beach systems is dependent upon the modelling criteria and on the selection of the sand material to be used for nourishment. In order to obtain a stable beach...
The Use of Hydraulic and Mathematical Models for Designing a Small Artificial Beach
This paper presents a case study in which physical and mathematical models are used for determining the behavior of a small artificial beach under wave attack. The beach is protected by...
Constructed Wetlands at Mesquite, Nevada
Subsurface flow (SF) wetlands are used to provide effluent polishing following treatment in an aerated lagoon at Mesquite, Nevada. General SF wetland design methodology is discussed in...
Reliability-Based Estimates of Wetland Detention Times for Wastewater Treatment
Determination of the hydraulic residence or detention time is often the first step in design of wetlands constructed for wastewater treatment. Current methods for estimating wetland detention...
Inventory of Constructed Wetlands for Municipal Wastewater Treatment in the U.S.
The U.S. EPA's Risk Reduction Engineering Laboratory is conducting an inventory of constructed wetlands (CW) for municipal wastewater treatment in the U.S. The inventory is...
Electronic Computation
This proceedings,
Approximate Methods and Verification Procedures of Structural Analysis and Design
This proceedings,
Connecting With DOTs
Want to bid on projects from state departments of transportation? First make sure your firm can translate computer-assisted drafting (CAD) drawings into different computer file formats....
Breaking Down the Barriers
The structural engineering of multistory buildings is a complex and time-consuming chore, but new design and analysis tools can greatly simplify the task. The article traces the development...
LRFD: Still Waiting
Introduced in 1986, load and resistance factor design (LRFD), has a way to go before it becomes standard practice for steel design. LRFD-based design typically results in savings on gravity...
CADD for Export
By using sophisticated structural design software and high-speed PCs, engineers in Pittsburgh overcame myriad problems when designing a highrise industrial tower in India. First, they...
More Power to the Allegheny?Design of the Allegheny 8 & 9 Hydroelectric Stations
The 13 MW Allegheny 8 Hydroelectric Station and the 17 MW Allegheny 9 Hydroelectric Station are located on the Allegheny River in the Commonwealth of Pennsylvania. The generating facilities...
The PEC Headworks Project?A Cooperative Hydropower Development
The PEC Headworks Project is a single-unit hydroelectric facility located at the headworks of the Potholes East Canal at O'Sullivan Dam on the Potholes reservoir near Moses...
Development of a New Hydraulic Design Tool for Spiral Casing/Distributor Geometry
A novel computational model has been developed to predict highly complex turbulent flow in a combined spiral casing/distributor geometry. Validation of the computational model against...
Ferroresonance & the Snettisham Hydroelectric Project
Key system features of the Snettisham power plant in Alaska will be highlighted along with a discussion of the operational problems encountered due to a ferroresonant condition. The project...
Design Considerations for Radial Key Retrofit
A practise that is becoming more and more common is to retrofit hydro-electric generators with Radial Key Systems. There are significant design considerations that must be made to ensure...
Potholes East Canal Headworks Project
The construction of 6.5 MW Potholes East Canal Headworks in Washington required near vertical excavation of about 100 ft (30 m) through the existing earthfill dam founded on columnar basalt....
Return to search