Survey of Stormwater Detention State of Practice
A survey of stormwater professionals in the United States and Canada was conducted by the Urban Drainage and Flood Control District in 1991 regarding the current state of practice in the...

A Salmon Population Model for Evaluating Alternative Flow Regimes
Salmon populations in many Pacific coast rivers are in decline and in danger of becoming threatened or endangered. A fish population model that tracks chinook salmon from eggs to the immature...

San Diego County Water Authority's Emergency Storage Project Supplying Water During Natural Disasters
The San Diego County Water Authority (Authority) is developing the Emergency Storage Project (ESP) to improve the dependability of the County's water supplies during a natural disaster...

Engineering, Construction, and Operations in Space IV
This proceedings, Engineering, Construction and Operations in Space IV, consists of over 155 papers presented at Space 94, the Fourth International...

Robotics for Challenging Environments
This volume, Robotics for Challenging Environments, contains the papers presented at the ASCE Specialty Conference on Robotics for Challenging...

The Job-Order Contracting Solution
A new method of contracting, Job Order Contracting, combines many contracts into one administered by one project team. They are competitively bid, indefinite delivery, indefinite quantity,...

CAD for Small Hydro Projects
The quest to reduce design costs and improve design quality by raising productivity is familiar to every manager and designer. This article examines how CAD can play a role by examining...

Rehabbing Bridges Under Traffic
Four urban examples demonstrate how an owner's decision to keep it open during rehabilitation construction forces the designers to contend with an extra set of problems. Reanchoring...

Locking Into Success
In 1961, at Wheeler Lock in Alabama, crews with the Tennessee Valley Authority tried to incorporate an existing lock wall into a new cofferdam. A major portion of the land wall slid about...

OSHA and the Design Professional
Since the creation of the Occupational Safety and Health Administration, the question of how the role of design professionals - engineers and architects - relate to the safety of a construction...

Coastal Groins and Nearshore Breakwaters
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers No. 6. This book provides guidance for the design and placement...

Roller Compacted Concrete IV
This engineering manual Roller-Compacted Concrete from the U.S. Army Corps of Engineers provides information and guidance on the use of roller-compacted...

Modular Evolution
The construction industry typically thinks of modular steel bridges in terms of the World War II vintage Bailey Bridge. The Bailey Bridge was designed to be quickly deployed to replace...

A League of Their Own
New baseball stadiums in Cleveland and Arlington, Tex., opening in April 1994, combine the nostalgia of traditional ballparks with state-of-the-art site planning and structural engineering....

Multimedia in Civil Engineering
Multimedia inspires so many claims and hype that it can be hard for engineers to figure out what's real and what's not. The truth is that multimedia holds great...

The Channel Tunnel: Larger Than Life, and Late
The Channel tunnel opens in May, but passenger service will be delayed while final testing on trains and electrical systems are completed. The English Channel tunnel crossing is the world's...

Microsurfacing Urban Pavements
A European maintenance technique called microsurfacing can add years to the service life of cracked, ravelled pavements--with minimal interruption to traffic and for less than half the...

Is It Necessary to Compromise Engineering Ethics to Remain Competitive in Today's Marketplace?
The test of time has shown that by maintaining high ethical values, one can succeed in any marketplace, no matter how competitive, says the winner of the 1993 Daniel W. Mead Essay Contest...

Flood Control vs. Flood Management
For the last 130 years, flood policy in the U.S. has been dominated by the belief that floods can be controlled by structural methods, such as levees, dikes and embankments. These efforts...

Graphical-Based Productivity Transient Investigation Using DISCO
Construction operations involve complex resource interactions and are typically performed in the field with exogenous factors such as inclement weather conditions and equipment breakdowns....

 

 

 

 

Return to search