Television and Scanning Sonar in Seattle Metro's Siphons and Brick Sewers
Comprehensive and often costly investigations are required in order to identify performance deficiencies of the pipeline in sewer systems, particularly when sewers in excess of 48-inch...

Infrastructure Damage Modeling with GIS
This paper describes the use of a geographic information system to model damage to a municipal water distribution system. In a demonstration application detailed attribute data on components...

Detecting Leaks in Geomembranes
A field-tested leak-location survey, now commercially-available, can provide construction quality assurance or solve a leakage problem in lined landfills, impoundments or tanks. A liner...

Pipeline Infrastructure II
This proceedings, Pipeline Infrastructure II, contains papers that were presented at the International Conference sponsored by the Pipeline...

Drilling with Direction
Norfolk, Va.'s 48 in. diameter raw water main crosses three rivers in its 52,000 ft route. At the Elizabeth River, an aerial or subaqueous crossing was not feasible, so a...

Trenchless Track Record
Ottawa is a leading user of trenchless technology for sewer rehabilitation projects. The municipality has nearly a decade's worth of experience with at least nine different...

Evaluation of Dilatometer Method to Determine Axial Capacity of Driven Model Pipe Piles in Clay
The flat Dilatometer (DMT) provides a unique approach to estimate the effective stress axial capacity of driven displacement piles in clay. An investigation using this approach was performed...

Execution and Evaluation of High Capacity Caisson Load Tests in Glacial Deposits
As part of the Boston Harbor clean up project, the new 1,000 mgd Deer Island Sewerage treatment plant includes ten 240 feet high egg-shaped 'residuals' tanks. Contract documents called...

Slip-Lining Solution
Grouting the annular space between a corroded sewer pipe and newly installed liner pipe is a stage of a typical sewer line rehabilitation project which contains hidden problems and difficulties....

The Big No-Dig
As part of the Boston Harbor cleanup project, engineers will have the opportunity to make a rare, side-by-side comparison of open-cut construction and no-dig technology during the Wellesley...

Laupahoehoe Harbor Planning, Design, & Construction
Laupahoehoe Harbor provides access to the fertile fishing grounds along the northeast or Hamakua coast of the island of Hawaii, Hawaii. The planning, design, and construction of Laupahoehoe...

A Design Manual for Coastal Fluidization Systems
This paper summarizes a recently completed design manual on fluidization systems to manage sand in the coastal environment for sand bypassing at inlets and harbor mouths and for creating...

Tackling Trapped Sediments
Crater-sink fluidization has been used to recover sediment from harbors for the past couple of decades. Can this method bypass sediment around dams and return it to eroded beaches, solving...

Motown Tunneling
When finished in 1993, Wayne County Michigan's $69 million wastewater treatment/sewer project will link outlying areas such as Dearborn with sewage treatment facilities in...

Turbulence, and Energy Loss, at Combining Pipe Junctions
Efforts to measure and describe the loss of energy at 90? sharp-edged junctions are described. The work is focussed on energy losses at discharge and area ratios for which there are no...

General Mechanism of Turbulence
By considering the vortex structures of turbulence and using the concept and theory of the pulsative convection and diffusion of instantaneous vorticity in a viscous fluid motion, the...

Wave Propagation in Solids
The last fifty years have seen the development of a large number of application of the theory of wave propagation in solids to problems of interest to civil engineers. Most notable have...

Piping in Earth Dams of Dispersive Clay (Paper introduced by Norman L. Ryker)
In 1971 Jim Sherard was engaged to investigate the common failure of a group of Soil Conservation Service (SCS) floodwater retarding earthfill dams built between 1957 and 1970, eleven...

Stabilizing Drop Structure by Drainage Modifications
East Drain Terminal Drop Structure is located in East Drain, an open toe drain of Palmetto Bend Dam, in the tide water area of south Texas. The drop structure was threatened by piping...

Degradation of Ground Water by Tetrachloroethylene
Ground water from many municipal water wells in California has been degraded by tetrachloroethylene (PCE) at concentrations above the drinking water standard. Investigations conducted...

 

 

 

 