Development of the Tampa Bay Tidal Current Atlas
The NOAA National Ocean Service (NOS) is developing a tidal current and water level forecast atlas for navigation in Tampa Bay, Florida, using the Princeton three-dimensional numerical...

Evaluation of the Return Period of the September 1992 Flood in Genova, Italy
The September 1992 flood in Genova caused great damage and loss of life. The flood peak, at the outlet of a 12.5 km2 basin, was estimated at 200...

Elmhurst Quarry Flood Control Project
Conversion of a limestone quarry into an off-line reservoir provides flood protection for a rapidly developing County in the suburbs of Chicago....

Explicit Stochastic Modelling of a Reservoir for Hydropower Production
A new reliability model for planning the operation of a multipurpose reservoir for hydropower generation and flood control, which considers the stochastic nature of inflows and power demand...

Procedures for Evaluating the Effects of Sedimentation on Flood Hazards in Urbanized Areas in the Southwestern U.S.
Urbanization of watersheds in the arid Southwestern U.S. creates problems for resource agencies and design engineers. Traditional analytical techniques that are generally applicable to...

Dam Safety Issues Related to Urban Detention Ponds
Detention ponds located within or adjacent to individual residential developments provide significant benefits by improving water quality and preventing damages from floods up to the design...

Tug Fork Flood Plain Modifications and Wetlands Mitigation
The West Virginia Department of Highways (WVDOH) is using a two stage channel excavation concept to mitigate the hydraulic impacts of relocating U.S. Route 119. The selected highway alignment...

An Interactive Regional Regression Approach to Estimating Flood Quantiles
In Texas, a computer program has been developed which will estimate flood quantiles for an ungaged site based on data from gaging stations with similar watershed characteristics. The user...

Homogeneity Tests Based Upon Gumbel Distribution
This paper analyzes the performance of three homogeneity tests for Gumbel distributed flood flows. The classic Dalrymple test, a method-of-moment Cv test, and a normalized-quantile test...

Survey of Stormwater Detention State of Practice
A survey of stormwater professionals in the United States and Canada was conducted by the Urban Drainage and Flood Control District in 1991 regarding the current state of practice in the...

Retaining and Flood Walls
The engineering manual Retaining and Flood Walls from the U.S. Army Corps of Engineers provides guidance for the safe design and economical...

Flood Control vs. Flood Management
For the last 130 years, flood policy in the U.S. has been dominated by the belief that floods can be controlled by structural methods, such as levees, dikes and embankments. These efforts...

Using Knowledge Based Systems for Training the Young Engineer
A Knowledge Based System 'HYDOC' (Hydraulic Design of Open Channels) is presented as a means to capture the knowledge of evaluating an open channel design problem to help teach evaluating...

Using Pen Computers in Post-Disaster Insurance Claim Settlements
The advanced use of pen computers for insurance claim damage assessment and settlement are explored. The advantages of implementing such a paperless approach to insurance claim settlements...

Measuring the Benefits of Flood Risk Reduction
Property damages avoided, land price analysis, and contingent valuation were techniques used to estimate the economic benefits of flood risk reduction for residential land parcels in Roanoke,...

Uncertainty and Time Preference in Shore Protection
From a review of economic, psychologic, and geographic literature, three points of criticism of the economic model of choice are 1) when faced with losses, individuals tend not to be averse...

Risk-Based Analysis for Flood Damage Reduction
The traditional approach of the U.S. Army Corps of Engineers to flood damage reduction studies is compared to risk-based analysis, a method of performing studies in which uncertainty in...

Quantifying Flood Damage Uncertainty
The U.S. Army Corps of Engineers (Corps) has adopted a risk-based analysis procedure to analyze the effect of uncertainty on flood damages and the benefits of flood damage reduction projects....

Flood Loss Assessment with Integrated Measures
In most cases, the maximum flood loss reduction can be achieved only by an optimal combination of both structural and nonstructural measures. An integrative approach that combines the...

Risk Management Strategies for Natural, Manmade, and Technological Hazards
The sixth session featured three important applications of risk and reliability analysis in water resources planning. Papers were presented on incentives to use reliability and risk analysis...

 

 

 

 

Return to search