Failures and Problems with Lift-Slab Construction
This chapter provides an overview of failures and problems with lift-slab construction. Topics include jack systems with inadequate take-up devices; the Canadian wedge connection; Serra...

Lifting Collars and Lifting Equipment
The terms lifting collars and shear heads are used interchangeably in the industry. In this book the term lifting collar is used since it is a unique term applicable to lift-slab construction...

Stability and Loads
This chapter examines stability and loads. Topics include stability and lateral load resistance during construction; effective lengths of cantilever columns; effect on stability of frame...

Initial Considerations
The purpose of this section is to aid the line designers in developing their specifications for fiber-reinforced polymer (FRP) materials utilized in electric overhead line structures....

Materials and Manufacturing Processes
This chapter introduces the basic materials used in the manufacturing of composite structures. It will help the line designer in understanding how the different elements of the fiber-matrix...

Performance-Based Criteria for FRP Products and Materials
In most ways, fiber-reinforced polymer (FRP) structures perform similar to wood and steel structures. There are, however, certain differences and these differences are described in this...

Evaluation of the Geo-Con Vert Wall System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center This report describes a HITEC evaluation designed...

Superior Court
For a sport obsessed with getting a round ball through a hoop, the shape of the new Naismith Memorial Basketball Hall of Fame seems entirely appropriate. The building is intersected by...

Evaluation of the Inter-Lok Retaining Wall System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed...

Evaluation of the Tricon Retained Soil Wall System
Prepared by the Highway Innovative Technology Evaluation Center, a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed to...

Evaluation of the Maccaferri Terramesh System Retaining Wall
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF/IIEC Innovation Center. This report describes a HITEC evaluation designed...

Crossing the Yangtze
The Nanjing Second Yangtze River Bridge, which links two parts of the city of Nanjing, features the first use of an epoxy asphalt deck pavement in China and one of the longest cable-stayed...

Preserving Pisa's Treasure
Pisa's bell tower, a prime example of Romanesque architecture, would be renowned even if it did not lean. Construction of the tower began in 1173 and was not completed until...

The Submarine Mission
A new Navy engineering and support facility for submarines has been designed and constructed at Lake Pend Oreille, near Bayview, Idaho. The project includes a bridge approach to the facility,...

Winning Combination
The complex, 4.1-mi (6.6-km) long Richmond-San Rafael Bridge across San Francisco Bay is being upgraded as part of California's $2.5-billion program for seismically retrofitting...

The Chernobyl Problem
When the infamous accident at the Chernobyl Nuclear Power Plant occurred in April 1986�a catastrophe that involved an explosion that blew off the top of one of the plant's...

Berm Breakwaters?Design, Construction and Monitoring
The philosophy of the fieldwork of Berm breakwaters was applied in Iceland. A few case histories were described with emphasis on quarry investigations, design, construction and monitoring....

Design and Construction of the Pier J Breakwaters at the Port of Long Beach, California
Several different alternatives to mitigate surge activity were investigated. The most acceptable solution was a pair of new breakwaters that altered the basin geometry to change the basin...

Construction Factors and Monitoring Methods Relating to the Performance of Ventura Breakwater Core Loc Repair
In 1999 the Los Angeles District of the U.S. Army Corps of Engineers (USACE) repaired the north Ventura breakwater head. The head was rebuilt using 2-ton underlayer stone armored with...

St. George Habor?Berm Breakwater Construction Considerations
During the period 1984-1987 three berm breakwaters with a total length of approximately 800 meters were constructed at St. George Harbor on St. George Island in the Pribil of Chain of...

 

 

 

 