Reclaiming Wastewater in Phoenix, Arizona
This paper examines the role of wastewater effluent reuse in the future water resource management of the City of Phoenix. The paper seeks to explain why a proposal to renovate effluent...

The Reclaimed Water Delivery System and Reuse Program for Tucson, Arizona
The City of Tucson has implemented a reclaimed water reuse program in a community-wide effort to preserve high quality groundwater for potable and other priority uses. Presently, the system...

Steel Plate Girder Alternate I-10/I-17 Interchange
The scope of the Phoenix I-10 Viaduct allowed extensive study for the optimization of this moderate span steel plate girder bridge. The value engineering studies lead to the use of the...

A Decision Support System for Freeway Corridor Analysis
When the scope of a particular corridor study dictates the review and analysis of a relatively large number of road segments along major transportation corridors, the integration of roadway...

A Data Base System for Hazardous Materials Transportation
This paper reports on a hazardous materials transportation study conducted in Arizona. Two types of surveys were conducted: hazardous waste shipments for 1983 and 1984 compiled from manifests;...

Evaluation of the Utilization of Information Systems in the Arizona D.O.T.
The design of effective information systems requires a rational analysis effort to determine specifically what functions are to be served by the system and how the system can satisfactorily...

Public Involvement Strategies: A Case Study in Citizen Participation
Literally millions of dollars are wasted every year because authorized and funded water projects are stalled in court, hung up in administrative proceedings, or delayed while the project...

Removal of Trace Organics in MunicipalWastewater
This paper presents the results of three years of monitoring effluent quality from two treatment facilities for trace organic chemicals in Pima County, Arizona. Approximately thirty 24-hour...

Central Arizona Project Startup
The Central Arizona Project is a water conveyance scheme, lifting and conveying Colorado River water from Lake Havasu on the Colorado River 190 miles to Phoenix and another 150 miles to...

Solving Stormwater Drainage Problems Through an Area Drainage Master Study Program
The Flood Control District of Maricopa County, Arizona, is the floodplain and stormwater management agency for the most densely populated county in the State. A major new tool being used...

Automated Control for Central Arizona Project Distribution Systems
Computer based automatic control for three extensive open channel water distribution systems is described. Radio telemetry allows a central computer to execute control logic at individual...

Monitoring Groundwater Quality in the Southwest
Monitoring groundwater quality near sources of pollution in the southwest commonly involves highly productive alluvial aquifers. Experience in monitoring in such a setting indicates that...

Revitalization of Urban Water Supply and Distribution Systems: Detroit and Phoenix Case Studies
In 1980 the people in the Detroit Water and Sewerage Department were asking themselves the kind of question that is facing the managers of many municipal utilities in this country these...

Initial Operation Model for the Central Arizona Project
A microcomputer program for operating uncompleted portions of the Central Arizona Project has been developed. Engineers may use this program daily to assist in scheduling pumping plant...

Chaparral Watershed Management: A Systems Approach
The predicted environmental and economic effects of partial chaparral conversion for increased water yield on an experimental watershed in the Prescott National Forest, Arizona, are examined...

Computer Model for Wastewater Reclamation
This paper describes how an efficient computer model can be constructed and used to evaluate planning options for wastewater reclamation. The situation in the City of Scottsdale, Arizona,...

Water Duty for Agriculture in the Western United States
The agricultural water duty is a measure of the quantity of water reasonably required for use in agricultural crop production. For some time in the western United States, the agricultural...

Optimization of Irrigation Distribution System Operation
The initial phases of the Federal Central Arizona Project (CAP) are nearing completion and in the latter part of this year the long-awaited delivery of Colorado River water will become...

Streamflow Losses, Consequent Flow Through a Thick Unsaturated Zone, and Recharge to an Unconfined Aquifer
Two experiments were conducted in conjunction with a 23-day aquifer test made in south-central Arizona to determine (1) water loss from a natural channel and (2) flow through a 330-foot-thick...

Buried Fiberglass Pipe Response to Field Installation Methods
In 1970 near Yuma, Arizona, a field test installation of 30 inch diameter fiberglass pipe was constructed. Twelve years later the pipeline was remeasured. Measurements of pipe profile,...

 

 

 

 

Return to search