IVHS Strategic Planning for Washington State
Implementation of IVHS technologies must be based on a strategic planning approach. The strategic plan must consider regional and statewide needs and should prompt integration of IVHS...

Advanced Highway Control on the Central Artery
The Boston Central Artery/Tunnel project involves highways 190 and 193, in downtown Boston, placing underground 7 miles of four to eight lane tunnels. The project, with 37 lane-miles underground,...

IVHS-Organizational Structure and Staffing
Continuing technology advances in IVHS present challenges that many states are unable to meet with their current staffs. Only a few states have recognized the need to plan the need to...

An Integrated Route Assignment and Traffic Simulation System with a Massively Parallel Computing Architecture
This research presents two critical issues in the development of an integrated route assignment and traffic simulation system of ATMS-ATIS applications. The first issue addresses the conceptual...

Lessons from Hurricane Andrew's Effects on Hydraulic Structures
Documentation and description of Andrew's effects on open channels and other hydraulic structures in South Dade County, Florida, are presented, based on observations made during field...

A Computer System to Operate Coastal Structures
The Central and Southern Florida Flood Control Project (C&SF) was designed and built by the U.S. Army Corps of Engineers and is operated and maintained by the South Florida Water...

Hydraulic Modeling of Alluvial Plains (Slopes) and Alluvial Fans Using DAMBRK
The design of hydraulic structures such as bridges on distributary flow areas and alluvial fans require methods that can adequately determine discharges at the structures. Flow conditions...

Non-Intrusive Crack Detection in Clay Landfill Cover Liners
Laboratory and field studies were conducted to demonstrate that the azimuthal variation in electrical resistivity can be used to indicate the presence of cracks in clay systems. Laboratory...

A Semi Passive Nutrient Injection System for In Situ Bioremediation
A permeable cutoff wall is installed across the path of a contaminant plume. The water in the wall can be amended with the desired nutrient solution using pumping and injecting wells within...

A Review of Surface-Groundwater Interaction Models
Surface-water and groundwater systems are in continuous dynamic interaction. Processes such as infiltration from surface waters and precipitation, the discharge of groundwater to surface...

Model Structure Validation in Groundwater Modeling
Structure equivalence models (SEM), a new concept in groundwater modeling, have been developed to assist in groundwater planning and management. Using SEM, the engineer is able to satisfy...

Linear Pertubation Model: An Application to Tanzanian Catchments
Floods are still a problem to many countries in the world todate. Floods do cause damage to property and sometimes loss to human life. Flood control measures by structural and non-structural...

Getting Along: The Geotech and the CM
The opinions of geotechnical engineers are usually respected within a consulting firm, but when such a specialist gets out in the field, he or she is seen as merely part of the backup...

Lead is a Four-Letter Word
New regulations and strict enforcement make it difficult and expensive to remove lead-laden coatings from steel structures. Lead-based primers and paints are not considered hazardous as...

The Coyote Dam Outlet Works Replacement Project: Hazard Reduction
The Santa Clara Valley Water District's Coyote Dam faced three major concerns: siltation of the existing outlet; a fault that crosses the existing outlet pipe; and the dam toe and the...

Hydraulic Performance of Culvert End Sections Designed for Collision Safety
A type of end section for pipe culverts that was designed for collision safety has some favorable hydraulic characteristics. These safety end sections are long and narrow with large steel...

Compacted Spillway
The compacted spillway (CSW) refers to a spillway accompanied by jets located on its face to dissipate the excess energy. The (CSW) has a standard ogee profile with three jets located...

Equations to Predict Critical Submergence at Horizontal Hydraulic Intakes
The formation of free surface vortices at hydraulic intakes can disrupt operation and damage machinery. It is also a serious safety concern. Theoretical investigations and laboratory tests...

Hydraulic Analysis of the McCook Outlet Manifold
A 1:40-scale model of the proposed McCook Outlet Manifold was tested at the U.S. Army Engineer Waterways Experiment Station (WES). Subsequently, flow conditions in the manifold were calculated...

Sedimentation and Flood Protection for the Lower Yellow River
The Lower Yellow River is known for its disastrous floods in the past. After 4 decades without major floodings, rapid economic and population growths along the River have drew concerns...

 

 

 

 

Return to search