CWSI and Stomatal Resistance of Cotton and Soybeans
A new instrument, Scheduler(TRADEMARK), has been developed to measure the onset and duration of plant water stress. This device consists of a sensor package (containing an infrared thermometer,...

Establishing a Monitoring Program for Formulating Water Quality Objectives in a Transboundary Reach
A systematic approach to the establishment of a monitoring program for formulating water quality objectives in the Similkameen River should include the following interactive steps: 1)...

Surge Flow?Automation of Surface Irrigation?At Last
The studies which led to the development of Surge Flow at Utah State University, began as an effort to automate surface irrigation systems. The first prototype models, were electric control...

Operation of Glen Canyon Dam during 1983 and 1984 and the Repairs of Glen Canyon Spillways (abstract)
The gates at Glen Canyon Dam were closed in the spring of 1963 and the reservoir did not fill until the summer of 1980. The spillways were tested in 1980 with only slight evidence of operational...

The Scourge of Scour
Among 86 bridge failures from 1961 to 1976, more were caused by scour than by earthquakes, wind, structural problems, corrosion and accidents combined. Scour is the erosion of a stream...

Comparative WWind Tunnel Testing of Bridge Road Decks
A 1:75 scale full aeroelastic model of the Quincy Bridge over the Mississippi River was tested in the National Research Council of Canada 9 m multiplied by 9 m wind tunnel. Tests were...

Are Soil Moisture Accounting Models Needed for the Real Time Forecasting of River Flows?
The difficulties inherent in using conceptual rainfall-runoff models in conjunction with filtering techniques, for the real time forecasting of river flows, are reviewed. The issue of...

Water Supply Analysis for the Milk River Basin, Montana
The U. S. Bureau of Reclamation's Milk River Irrigation Project provides water for 55,000 ha of irrigation in the Milk River basin of Montana. The project includes an interbasin...

Estimating Firm Yield and Reliability of Small Reservoirs on Ungaged Streams in North-Central Montana
A reservoir-operation algorithm utilizing a sequence of monthly streamflows from a lag-one Markov model is proposed for estimating firm yield and reliability. The reservoir-operation algorithm...

Missouri River Basin Water Accounting System
A water accounting system was developed for the Missouri River Basin to establish an accurate and acceptable base of information describing water availability and uses, and to provide...

Optimizing a Minimum Instream Flowby
The Commonwealth of Virginia is currently investigating methods to establish minimum instream flow requirements which may be applied to flow allocations statewide. The Crump Creek Reservoir...

Mesonets--A Solution to Improving Flood Forecasting
Floods continue to cause major destruction annually despite the efforts of Federal water resources agencies. Improved flood forecasts can reduce flood damages and corresponding loss of...

ENDOW, An Expert System for Screening Environmental Features for Stream Alternations
This paper discusses development of an expert system for Environmental Design of Waterways Projects (ENDOW) by stream alteration specialists who were novices in artificial intelligence....

Feasibility Studies of Flood Warning-Response Plans
Local flood warning-emergency preparedness plans consist of hardware, technical activities, and formal and informal inter- and intra-organizational arrangements and commitments to performance...

Seepage/Drainage Investigation Colusa County California
High groundwater in the late winter months saturates the soil profile, causing damage to both crops and soil. Sustained water logging severely damages or destroys orchards. It has generally...

Overview of a Real-Time Flood Management Model
A flood management model was developed for the operation of the six reservoirs making up the Highland Lakes System on the Colorado River in Texas. The model allows simulation of over 700...

Emerson, Iowa Flood Warning System
A flood warning system was installed in 1985 by the Corps of Engineers at Emerson, Iowa as part of Emerson, Iowa Flood Control Project on Indian Creek. The warning system consists of two...

The Santa Ana River Flood Forecasting System
A real-time flood forecasting and reservoir operations simulation system has been developed for the Santa Ana River Basin, located in southern California. The system consists of generalized...

Flood Forecasting Using Local Resources
A dynamic wave flood routing computer program has been used to develop a flood forecasting model for a 5000 mi**2 watershed in lower Michigan. The modeled area covers over 200 miles of...

Flood Forecasting with Minimal Data
The Corps of Engineers' HEC-1 program has been used with a specialized pre-processor program to provide interim emergency flood forecasting for a 4000 sq mi (10,360 sq km) watershed in...

 

 

 

 

Return to search