Performance Study of the Lagoon at Inuvik, N.W.T.
Since 1957, Inuvik's sewage has been discharged into a lagoon situated northwest of the townsite. In 1982 the lagoon was upgraded to a two-stage system. Two primary cells...

Evaluation of Sewage Treatment Requirements in Cold Regions: Case Study?City of Whitehorse
This paper describes a method available for evaluating sewage treatment requirements in cold regions. The City of Whitehorse wastewater management situation has been used as an example...

Frazil Ice Problems in Intakes at Montreal
Intakes located in reaches of the St. Lawrence River that stay open all winter can be subjected to frazil ice formation for nearly three months. The City of Montreal intake is a key example...

Geotechnical investigation: Cominco's Red Dog Mine Facilities
The siting of major facilities associated with development of the Red Dog Mine Complex in Northwestern Alaska on relatively warm permafrost soil and rock presented geotechnical engineers...

Permafrost: A Suitable Landfill Containment Barrier
Ice-rich permafrost is a suitable medium for the containment of wastes. The combination of frigid dry Arctic climate and the impermeability of ice-cemented permanently frozen ground can...

Innovative Solutions to the Challenges of Heavy Civil Projects
Each heavy construction project presents unique conditions and challenges. For large projects, the work scope may justify an extensive engineering analysis and significant investments...

Construction Insurance: An Alternative Unified Risk Insurance
The transfer of risk mechanism (insurance) can be applied to solve problems unique to the construction environment. The proposed program is worthy of support since all segments of the...

Future Containerships from a Ship Owner's Viewpoint
This paper is a presentation of the author's projection of size and design constraints of future containerships. There is a discussion of containers and on-deck container...

Fault Diagnosis of Hazardous Waste Incineration Facilities Using a Fuzzy Expert System
The use of an expert system along with fuzzy fault tree analysis is discussed in connection with fault diagnosis of a hazardous waste incineration facility. This fault tree is a diagrammatic...

An Expert System for Inactive Hazardous Waste Site Characterization
The area of hazardous waste management is a broad and multidisciplinary field requiring expertise in engineering, geology, chemistry and toxicology, and is an ideal area for the application...

A Salt Solution for Nuclear Wastes
The Department of Energy's Waste Isolation Pilot Plant in Southeastern New Mexico is the nation's first full-scale facility for disposing of radioactive waste...

Cleaning Up Toxics
Case histories show how several different types of contamination cleanup were handled. In Attleboro, Mass., washwater, used to decontaminate equipment and tools after cyanide was removed...

Fire on the Water
Incineration is a promising hazardous waste disposal technique. However, nobody wants an incinerator constructed near him, so waste handlers are considering burning hazardous wastes at...

Treatment in Your Own Backyard
Everyone wants the nation's hazardous waste sites cleaned up, but nobody wants the wastes disposed of near them. Therefore, cleaning up these problems at the site may be the...

Attapulgite: A Clay Liner Solution?
Poor performance of clay liners at waste management facilities has resulted in the EPA mandate of synthetic polymeric liner materials to comply with zero penetration requirements. Laboratory...

Risk Assessment: Engineering Tool
In factoring in human-health impacts when tackling an environmental problem, risk assessment is often the best approach. Its use is growing fast. The technique increasingly is being used...

Pavement?An Integral Part of the Terminal as a Container Handling System
A modern container terminal requires extensive areas of paving for stacking and moving containers, the provision of which often proves to be one of the most expensive single items, in...

Berth 5-6 Pavement Performance: Port of Oaklan
In 1978 the Port of Oakland commenced a project to demolish the old Berth 5, 6 & 7 break bulk sheds, portions of the wharves, and the warehouses behind, and to construct container...

Tacoma Sea-Land Terminal: A Project Management Challenge
The Port of Tacoma completed a new two berth container terminal and intermodal yard for Sea-Land in May 1985 in only 26 months after signing a binding agreement. The project, which also...

Conversion of Keppel Wharves Conventional Berths 42 & 43 to Container Berths C13 and C14, Singapore
With further growth of container traffic expected in the 80's the need for additional facilities was apparent. Following an evaluation of available alternative sites, it was...

 

 

 

 