The Development and Writing of the ASCE Manual of Practice for Steel Penstocks
The 'Manual of Practice for Steel Penstocks' is being written under the supervision of the Hydropower Committee of the ASCE Energy Division. The committee felt...

Prefabricated Power Plants, Experience and Prospects
This paper presents the prefabrication concept applied to the Greenup (Greenup Locks and Dam, Ohio River, 72 MW, 1982) and the Sydney A. Murray, Jr. (Old River Control Structures, Vidalia,...

Rocky Mountain Project?Overview
The Rocky Mountain Project, in Northwest Georgia, will be a three unit hydroelectric pumped-storage project with 850,000 kW installed in an above ground powerhouse. The gross water volumes...

Hydraulic Aspects of West Delaware Tunnel Hydroelectric Development
Construction of a 7,500 kilowatt hydroelectric plant at the end of a 70 kilometer long water supply tunnel posed unusual hydraulic conditions that needed special consideration. Cooperation...

Composite Materials Show Promise for Clean Kaplan Runners
In order to prevent any possibility of oil leakage into river water, LMZ manufactured Kaplan runners containing oil in the blade servomotor only, while the blade operating mechanism operates...

Rehabilitation of the Historic Ocoee 1 Hydro Power Plant
The Ocoee 1 Hydro Plant is located on the Ocoee River 16 miles east of Cleveland, Tennessee. Built by the East Tennessee Power Company, it was placed in commercial operation in 1912. There...

Dillon Hydroelectric Project Performance Versus Expectations
The Dillon Hydroelectric Project was commissioned in 1987. Design and construction are briefly described; plant availability is compared with design expectations; and maintenance costs...

Development of Hanford Site Lysimeter Facilities
Lysimeters have been constructed at the Hanford Site near Richland, Washington to quantify mechanisms that affect migration of radioactive and hazardous waste in geologic media. The history...

Large, Monolithic, Weighing Lysimeters
Monolithic lysimeters preserve existing vegetation and soil properties that can be destroyed by excavation and filling. Site preparation for constructing large, monolithic lysimeters includes...

Lysimeter Use in Water Resources Research in China
The type, structure, development and application of lysimeter in China are reviewed in this paper. The construction and experimental observation of large non-weighing lysimeter in Ranzhuang...

Transpiration by Douglas Fir Using Lysimeters
During the spring of 1971 a 28 m Douglas fir tree was installed in a weighing lysimeter. Some details of construction are presented. The weighing mechanism consisted of eleven lengths...

Representativeness of Floating Evapotranspirometers
In the first part of the paper, the design, the working principle and the field installation of floating evapotranspirometer are described with the data logging system which delivers continuous...

Prefabricated Weighing Lysimeter for Remote Research Stations
After designing and constructing several precision scale system weighing lysimeters in Southern Europe and the Middle East, the need arose for a prefabricated 'turn-key'...

Effect of Choptank Watershed Drainage Project on Suspended Sediment Concentration
Between 1974 and 1982, the Soil Conservation Service, U.S.D.A. conducted a sediment concentration study on the Choptank Watershed in Caroline County, Maryland to monitor the effects of...

Innovative Reregulation Weirs for Dam Releases
Two different reregulation weir designs for dam release improvement are discussed. A porous timber crib is favored for applications where increased minimum flow is needed, and a labyrinth...

Appropriate Technology in Infrastructure Development and Management
Infrastructure management principles apply to appropriate technologies used for hydraulic structures. However, some of the principles are more culturally sensitive than others, mainly...

Temporary Facilities?Making It Happen, Organization and Logistics
As construction projects become larger, more complex and are constructed both faster and under more adverse conditions--the use of temporary facilities is more prevalent. Temporary facilities...

CPM Techniques for Claims Avoidance and Preparation
Virtually all major construction claims consist of some aspects of delay, disruption or acceleration. Since all of the foregoing relate directly to the timing and sequencing of the project...

Planning and Organization to Control Liabilities and Insurance Cost
The liabilities and insurance cost associated with construction projects can be considerable. Activities that are performed which carry extensive liability exposures with limited controls...

The Benefits of U.K. Guidance for Temporary Works
In British contracts the Contractor is responsible for the design and execution of temporary works unless the Design Engineer or the Client expressly instruct how the work is to be undertaken...

 

 

 

 