In Situ Testing of Calcareous Sand?Campos Basin
Sampling and in situ testing were used to investigate soil conditions for the installation of offshore platforms at the Campos Basin, Brazil. At these sites calcareous sand formations...
High Quality Sampling and In Situ Testing for Deep Water Geotechnical Site Investigation
This paper discusses methods that have been used to conduct geotechnical investigations in water depths up to 2500 feet. Investigations can be conducted from supply boats, geotechnical...
Lateral Stress Measurement During Cone Penetration
A lateral stress sensing cone penetrometer (LSSCP) was designed and fabricated. Based on the results of calibration chamber tests in sand, relationships between measured lateral stress,...
Ports '86
Ports '86 had the theme of Innovations in Port Engineering and Development with keynote speakers looking ahead to Port Development in the 1990's. The program...
Radium Removal from Groundwater Using Sorption to Filter Sand
The use of this novel process to remove sufficient radium from drinking water by filter sand has been demonstrated. A major potential advantage of this process is that a minimal capital...
Slow Rate Sand Filtration Using a Zeolite Surface Amendment
The objective of the study was to obtain detailed information regarding amended filter performance at surface loading rates 2 to 4 times higher than standard flow rates. Experiments were...
Clay Liner Hydraulic Conductivity: Comparison of Field & Laboratory Tests
Clay liner hydraulic conductivities at three hazardous waste landfill cells in Oklahoma and Utah were measured in the laboratory and in the field during construction. Prior to construction...
Clay Liner/Leachate Compatibility Modeling
Over the past several years, the results of many laboratory studies assessing the effect of various combinations of organic and inorganic chemical mixtures on the hydraulic conductivity...
Landslide-Generated Wave Studies
A serious safety of dams problem is associated with large masses of rock and debris plunging into lakes and causing damaging water waves. This concern prompted the Bureau of Reclamation...
Sea Level Rise and Coastal Stormwater Drainage
Global sea level rise as a result of the greenhouse effect and the past trend and future projection on the rise are discussed. Potential problems associated with coastal stormwater drainage...
Saltwater Intrusion in a Highly Transmissive Unconfined Aquifer
Saltwater intrusion is particularly dynamic in coastal Dade County because of the high permeability of the Biscayne aquifer, because of the good interconnection between canals and the...
Design for Comuputer-Aided Water Resource Planning
This paper discusses an integrated approach to computerizing the major functions of regulatory agencies involved in water resource planning and water quality protection. This integrated...
Coupling Free Vortex Energy Dissipation with Sediment Control
The paper reports on studies showing that sediment control down to the abrasive limit of 30 micron sand and energy dissipation can be achieved simultaneously with a Teacup free vortex...
California Water Project Operation
The California State Water Project (SWP) is operated and managed using state-of-the-art operations research and optimization techniques. Medium- and long-range studies for the operation...
Plunge Pool Energy Dissipators for Some Dams in Taiwan, ROC
This paper presents a brief description of the characteristics of the plunge pool type energy dissipators, including design considerations, hydraulic model tests, as well as the results...
Air Slot in Tunnel Spillways of Feitsui Dam
The tunnel spillway of the Feitsui Reservoir Project near Taipei has a head drop of more than 110 m, and maximum discharge of 1,500 cms. For prevention of cavitation in the tunnel, an...
Modeling of the Undular Jump for White Water Bypass
Two of the authors have reported previously on the hazard that a conventional hydraulic jump with a uniform reverse surface roller presents to white water boaters. The intent is to create...
Scale Model Study Benefits Hydropower Project
The Jim Falls Project on the Chippewa River in Central Wisconsin deals with the replacement of an aged 11 MW run-of-river hydropower plant by a 48 MW peaking plant. A hydraulic model built...
Estimating Probable Storm Damage on Barrier Islands
This paper demonstrates a methodology for estimating probable property damage losses from hurricanes on barrier islands. Using the case study of Gasparilla Island, Florida, it estimates...
Water Management of the Tenn-Tom Water
In December 1984 the final segments of the Tennessee-Tombigbee Waterway were completed. The Waterway connects the Tennessee River to the Gulf of Mexico at the City of Mobile. The total...
Return to search