Buffalo Bill Dam Modifications?Modification of an Existing Bureau of Reclamation Facility to Increase Power Generation
This paper describes a joint venture between the United States Bureau of Reclamation and the State of Wyoming to increase the storage capacity and power generation capacity of Buffalo...
Hydropower Analysis Using Electronic Spreadsheets
A sequential streamflow routing procedure is recommended to overcome the inadequacy of the conventional duration curve analysis, especially in cases involving multiple intakes for capturing...
Implementation of a General Purpose Site Monitoring Network
STS Hydropower owns and operates several hydroelectric plants distributed throughout the United States. These plants, equipped with intelligent controllers, have been remotely monitored...
Recent Developments in Computer Based Control Systems for Hydro Power Control
In recent years microcomputer technology has come to dominate electric control systems. Modern control equipment provides many convenient means for ensuring easy, precise and safe operation...
Successful Behavioral Devices for Fish Protection
Since 1987, the Electric Power Research Institute (EPRI) has been sponsoring studies of behavioral barrier devices for protecting fish at hydroelectric facilities. Primary emphasis has...
Tarbella?Third Extension Project Units 11 to 14: 440 MW Francis Turbine Design
At Tarbela Dam in northern Pakistan, the Third Extension Project, units 11 to 14 of 440 MW each, is presently under construction. When completed in 1992, the multipurpose hydro-irrigation...
Fluctuating Pressure Measurements on a Large Hydro Turbine
The New York Power Authority is investigating the feasibility of upgrading the thirteen 150,000 kW turbines-generators at the Robert Moses Niagara Power Station to improve efficiency and...
Digital Data Acquisition and Performance Testing of Hydroelectric Equipment
The U.S. Army Corps of Engineers Hydroelectric Design Center has elected to use digital data acquisition methods when conducting performance tests of hydroelectric units. Transducers have...
Renewal of the Burt Dam Generating Station
The present redeveloped hydro facility operates as a 300 kW run-of-river station automated by a head pond level controller which adjusts turbine setting to match available river discharge....
Turbine Conceptions for Low Heads and Their Application in US Hydro Power Stations
To improve the feasibility of small power plants standardized units were developed. The bulb turbine technology as well as the pit-type conception improve the feasibility of larger plants....
Environmental Engineering
The 1989 Specialty Conference on Environmental Engineering was held in Austin, Texas on July 10-12, 1989 with cooperation from the University of Texas at Austin Civil Engineering Department...
Odors: The Other Effluent
Neighbors object to unpleasant odors emitted at wastewater treatment plants, and dealing with such odors requires tact as well as technology. The operators and engineers must listen to...
Sludge in the Nineties
Strict new regulations proposed for sludge disposal have toughened the challenge ahead for engineers. The regulations are the first to ever address sludge disposal in a comprehensive,...
Bioremediation: Testing the Waters
Piotrowski describes the pilot study that led to the first EPA-mandated use of bioremediation to clean up a Superfund aquifer. (Bioremediation seeks to stimulate microbial activity to...
Big Trouble in Little America
Traditionally, rural communities in the U.S. have relied on septic systems to treat their wastewater. Many of the nation's 23 million septic systems, however, are failing....
Putting Waste to Use
Although it's only been nine years since Superfund was passed, a traditional hazardous waste disposal process has nontheless been established. That is, wastes are taken to...
Training the Waste Watchers
Whether an engineer is going to work at a Superfund site himself, or if his firm will be doing cleanup work at the site, that engineer will want to take the 40 hour training course as...
Quick Response on the Mississippi
In November 1987, the Mississippi River broke through the foundation of the St. Anthony Fall's Lower Dam Hydropower Plant. The plant's owner, the Northern State...
Waterpower '89
The 1980's have been characterized as an era of uncertainty for world energy including future demand for energy, fuel prices and availability, regulatory constraints, environmental...
Metro Project Implementation?The Early Stages
Metro (the Municipality of Metropolitan Seattle) is a federation of governments in King County, Washington which is responsible for regional public transportation and waste water collection...