Managing Risks of Hazardous Materials Transportation in Santa Barbara County
This paper presents some potential building blocks which local jurisdictions can pursue to manage the risks associated with hazardous materials transportation (HMT). The recent experience...

Field Instrumentation Program Vital to Deep Excavation Project
An extensive field instrumentation, monitoring and evaluation program was implemented for a seven-level deep excavation project in Boston. Using the observational approach, the information...

Geotextile Edge Drain Design and Specification by Expert System
Expert systems can be developed and operated on personal computers to aid in the design of the geotextile filter component of pavement edge drains. The expanding use of geotextiles in...

Up and Down Construction of a 17-Story Building
The One Westwood Building is located on a small site in the Westwood district of Los Angeles. Construction of the 17-story building with 8 levels of subterranean parking was complicated...

An Expert System for Preliminary Ground Improvement Selection
Ground Improvement is an area which has rapidly advanced in the past two decades. Most of the work has resulted from experience in field work. Thus experience has played a vital role in...

Development of the South Carolina Coast 1959-1989: Prelude to a Disaster
The history of hurricanes on the South Carolina Coast is reviewed. It is shown that reasonable design wind and surge conditions could have been established before the rapid development...

Hurricane Hugo's Effect on Marina Structures
The author has visited over twenty-five sites along the South Carolina coast and in Puerto Rico to ascertain the effects of Hurricane Hugo on marina facilities. Types of structures evaluated...

Hugo's Sturctural Damage in Puerto Rico
The results of a study of the wind damages caused by Hurricane Hugo is presented. Cases involving wood structures, industrial steel buildings, multistory reinforced concrete buildings,...

Structural Engineering Lessons Learned From Hurricane Hugo
Hurricane Hugo purported to be 'The Storm of The Century' caused considerable property damage over a tremendously large area effecting nearly everyone and every...

Lessons Learned by a Roof Consultant
Hurricane Hugo left in its wake, extensive damage, an estimated $6 Billion loss. It is estimated that over 80% of the losses were related to roof failures, and the associated water damages....

Architectural Lessons Learned From Hurricane Hugo
All of us in the building design professions have learned many lessons in the last year since Hugo. My experience, as with many of us in the design profession in Charleston, has been on...

Masonry Performance in the Coastal Zone
Investigators from the National Concrete Masonry Association (NCMA) surveyed the coastal areas of South Carolina from Charleston to Myrtle Beach during a seven day period just after hurricane...

Offshore Oil Terminals?Potential Role in U.S. Petroleum Distribution
The construction of port facilities in deep water, several miles seaward from the nations's coastline, is one of the measures that have been suggested for reducing oil tanker...

Case Study: Downdrift Benefits Four Miles and Six Years from a Gravelly Beach Nourishment on Lake Michigan
A Corps of Engineers gravel feeder-beach nourishment at New Buffalo, MI, in late 1980 - early 1981 gave an excellent opportunity to observe the downdrift progress of the gravel. This paper...

Beach Creation by Integrated Shore Protection System
By thinking back to the past efforts of shore protection works against coastal disasters in Japan, the reasons why many sandy beaches have disappeared and why the present shore protection...

Shore Protection Construction Along the California Coast
Severe beach, cliff and bluff erosion is occurring along the urban communities on the 1800 miles of ocean, bay and estuarine shoreline of California. This report is an overview of the...

Development of Long Beach Downtown Marina
This paper describes the planning and construction of the new Alamitos Bay Marina just offshore of Long Beach's downtown shoreline. From an engineering standpoint the construction...

Ebb Delta and Shoreline Response to Inlet Stabilization, Examples from the Southeast Atlantic Coast
Analytical studies were performed on the geomorphic evolution of four stabilized natural inlets located along the ebb-tide dominated, barrier island, southeastern coast of the United States....

A Re-Evaluation of Earthquake Hazards Within the California Coastal Zone: Lessons from the Loma Prieta Earthquake
The 7.1 magnitude Loma Prieta earthquake occurred on October 17, 1989, had a duration of 15 seconds, and took 62 lives. Among the lessons learned from this earthquake with regard to offshore...

The Construction of the Shanghai Port and Its Sea-Entering Channel
The Shanghai Port, the biggest port in China, has not enough passing capacity. In order to solve this problem, some new ports must be built. According to sedimentation, fluvial processes...

 

 

 

 

Return to search