Renewal of the Burt Dam Generating Station
The present redeveloped hydro facility operates as a 300 kW run-of-river station automated by a head pond level controller which adjusts turbine setting to match available river discharge....

Quick Response on the Mississippi
In November 1987, the Mississippi River broke through the foundation of the St. Anthony Fall's Lower Dam Hydropower Plant. The plant's owner, the Northern State...

Storing Sediment and Freeing Fish
When Mount St. Helens erupted in May 1980, it sent a river of pyroclastic ash and other debris into Washington's North Fork Toutle River Valley. The resulting debris pile...

Hydraulic Engineering
The papers in this book were presented at the ASCE National Conference on Hydraulic Engineering in August, 1989 at New Orleans, Louisiana. The objective of the Conference was to provide...

Sediment Transport Modeling
This is the Proceedings of the International Symposium on Sediment Transport Modeling, held in New Orleans, Louisiana, August, 1989. It reviews the state of the art and presents the latest...

Fast Track, Instant Track
There is a newly constructed railroad bridge over the Wilamette River in Portland, Oregon. The 499 ft. clear maritime channel allows the world's largest ships to navigate...

Post-Audits of Environmental Programs and Projects
This is the proceedings of a session at the ASCE Convention, New Orleans, October 1989. Post-audits include evaluation, assessment, and audit of the effects, both intended and unintended,...

The Pacific Northwest Rivers Study: Development of a Rivers Inventory and Analysis System
To minimize conflicts between hydropower development and resource conservation, the Bonneville Power Administration and the Northwest Power Planning Council initiated the Pacific Northwest...

Hydropower Development for Hawaii
A site specific, evaluation technique is being studied to examine hydropower potential based on an operations research approach for micro- and mini-hydropower systems under established...

Hydropower Development of the Hongshuihe, China
Power is the predominant factor in the development of the Hongshuihe River. The Province of Guangdong is the most highly developed area in the Pearl River Basin, where the fast growing...

Sri Lanka's Mini-Hydro Rehabilitation Programme
As part of Sri Lanka's medium term investment programme funded mainly by the World Bank and Asian Development Bank, the British Government's Overseas Development...

Hydro Development on the Huallaga River in Peru
The proposed Chaglla Hydroelectric Project, is located on the Huallaga River in Central Peru, about 300 km north east of Lima. The available gross head of 870 m and regulated flow of 58...

Expansion of Three Plants on the Saranac River
The capacity of three cascading hydro power plants, owned and operated by New York State Electric and Gas Corporation on the Saranac River near Plattsburgh, was expanded by a total of...

Considerations for Retrofitting Large Dams for Hydropower
The majority of large dams which are currently being retrofitted for hydropower are either flood-control impoundments or navigation structures. In the Ohio River Division of the U. S....

Optimizing Hydropower Potential Using Water Management Techniques
The development of hydropower facilities at existing dams creates an interesting dilemma to both public and private hydro developers: Is the proposed development the best-adapted use of...

Federal Vs. Non-Federal Hydroelectric Development
This paper presents the methodology and results of economic and financial analyses that were performed to indicate the optimum size powerplants that would be constructed assuming Federal...

Equipment Selection and Site Optimization Based on Energy Considerations
Most new hydro plants contribute little or nothing to overall system capacity. Therefore, traditional evaluation techniques based on dollars per installed kilowatt have no relevance when...

The Uncompahgre Hydropower Project?A Historical Perspective
The process required for developing a potential hydropower site is both well-known and straightforward. It begins with the conception of an idea, and is fulfilled by engineering, economic,...

Impact of Annual Repayment on Efficient Use of Power Revenues
Congressional efforts to control Federal budget deficits are leading to new requirements for fixed annual repayment of investment in power and irrigation facilities. Traditionally, investments...

Studies of Fish Protection Methods at Hydroelectric Plants
Five largely untested but economical fish-protection systems were tested at sites throughout North America. The process of selecting laboratory and field test sites was completed at the...

 

 

 

 

Return to search