Construction of Elk Creek Dam
Construction of Elk Creek Dam, located in Southwest Oregon, is currently underway with completion scheduled for September 1988. The main dam contract was awarded to Ohbayashi Gumi Ltd....

Saco Dam?South America's First RCC Dam
Because of cost and a lack of suitable embankment materials, Saco Dam at Nova Olinda in Paraiba, Brazil, was redesigned and built with lean roller compacted concrete (RCC). The structure...

Burlington Cable-Stayed Bridge
The Burlington cable-stayed bridge will carry US34 over the Mississippi River from Burlington, Iowa to Gulfport, Illinois. There will be two 12-ft lanes in each direction plus an acceleration...

Quincy Bayview Bridge?Construction Control
A cable-stayed bridge crossing the Mississippi River at Quincy, Illinois, was completed in August 1987. The structure includes twin concrete towers and a hybrid deck section. The cable...

Modeling Hydrologic Components of the Upper St. Johns River Project
Off-line stormwater management areas and riverine marsh conservation areas are the major components of the Upper St. Johns River Project, Florida. Dimensions and operations of these components...

Stochastic Model for the Management of a Stream-Aquifer System
The management of a system of groundwater and surface water requires that the hydraulic connection of the two sources be investigated. The inherent uncertainties that exist in the data,...

The Remedial Action Plan for the Fox River, Wisconsin
The nature of and need for Remedial Action Plans (RAP) in 42 areas of the Great Lakes is reviewed with special attention given to the Fox River and Lower Green Bay area. A brief historical,...

Water Assurance Districts: A New Concept in Local Government
Society has long utilized local governmental units to implement numerous water management functions. This paper discusses a new and relatively unique local organizational structure now...

Computerized Bridge Coding for HEC-2 Applications on I.B.M. P.C.
A computer program for conversion of survey field notes directly into SB, BT, and GR cards with simultaneous cross-section plot is described. It was designed to simplify the coding of...

An Investigation into Causes of Bank Caving
A series of investigations into bank caving along the Ohio River are described. These investigations include a study of the distribution of precipitation in the study region, derivation...

Use of Stormwater Models to Optimize the Performance of a Regional Stormwater Detention System
implications of stormwater models to develop a regional detention basin master plan for Fairfax County, Virginia are described. Following the selection of candidate sites and detention...

Administration of Water in the 21st Century in Accordance with the Appropriation Doctrine
In accordance with the appropriation doctrine it appears straightforward to distribute water during below-average supply, 'first in time of use, first in right of use'....

Considerations in the Design and Installation of Horizontally Drilled Pipeline River Crossings
The authors will present a review of directionally controlled horizontal drilling techniques for pipeline installation by describing the state-of-the-art of the process vis-a-vis subsurface...

Rehabilitation of the Seekonk River Interceptor Sewer, Providence, Rhode Island
The Seekonk River Interceptor, located in Providence, Rhode Island and owned by the Narragansett Bay Commission, is a combined sewer system originally built in the late 1800s. Portions...

Pipe Geometry and Pipeline Bridge Wind Oscillation
Static and modal analyses of two pipeline suspension bridges owned by American Natural Resources - the Patterson Loop Aerial Crossing (PLAC) with a span of 850 feet (259 meters) and the...

Design/Construct Contract Speeds Bridge Job
In the name of time and money savings, Pennsylvania DOT is building a bridge using a modified turnkey contract. In contrast, the standard approach is first to design the bridge, then ask...

Lessons from Schoharie Creek
The failure of the Schoharie Creek Bridge in New York State occurred in April 1987. Several investigative panels were commissioned. The failure has been generally attributed to scour,...

Lightning Spurs Hydro Rehab
In 1986, a bolt of lightning hit the Upriver Hydro Project in Spokane, Washington and tripped the plant off line. The event triggered a series of events that included an undermining of...

Cable Stayed Bridges
Two of these five papers on cable-stayed bridges deal with wind analysis. One develops the theory for motion due to flutter and reaches the conclusion that the vibrations are, in general,...

The Changing Federal/State Relationship in Water Resources: An SCS Perspective
Since 1935, the Soil Conservation Service (SCS) has worked directly with state and local agencies, and individual landowners, to conserve and develop the Nation's soil and...

 

 

 

 