Experience in Modeling for Environmental Physics and Biogeochemistry
This report is a short review of the author's personal experience on phys.-math. and system-logical modeling of migration and transport processes (MTP) of radionuclides, trace-elements...
Utility Oversight of Cask System Development Program
This paper will present the electric utility industry's perspective on the status and scope of the Department of Energy's Office of Civilian Radioactive Waste Management's (DOE/OCR WM)...
The DOE Waste Acceptance Process for the Vitrified High-Level Waste Form
Borosilicate glass from Defense HLW producers will be emplaced in the civilian radioactive waste repository. Vitrified HLW will be under production before the repository license application...
A Working Definition of Scenario and a Method of Scenario Construction
The event-tree method of scenario construction has been chosen for the Yucca Mountain performance assessment. Its applicability and suitability to the problem are discussed and compared...
Quality-Assurance Program Description Defense Waste Processing Facility
This paper describes the Westinghouse Savannah River Company's (WSRC) quality assurance program for defense-waste processing at the Savannah River Site (SRS). WSRC is the operating contractor...
Disposal of Defense Spent Fuel and HLW from the Idaho Chemical Processing Plant
Acidic high-level radioactive waste (HLW) resulting from fuel reprocessing at the Idaho Chemical Processing Plant (ICPP) for the U. S. Department of Energy (DOE) has been solidified to...
Treatment of Non Fuel Bearing Scrap
Problems encountered with the processing of irradiated non fuel bearing components (NFBC) during several rod consolidation demonstration programs identified the need to conduct further...
Using Co-Management in a Voluntary Hazardous Waste Facility Siting Process
The recent approval for construction and operation of a hazardous waste management facility in Manitoba, Canada is an example of a siting process that is voluntary and that gives the community...
Functional Analysis of the Exploratory Studies Facility
This paper discusses the development of the 'Physical System Requirements-Exploratory Studies Facility' (PSR-ESF) document. Based on a functional analysis approach, this document includes...
Managing the Nuclear Waste Fund
Through September 30, 1992, the Nuclear Waste Fund had received $5.8 billion in fee payments, earned $1.5 billion in interest, and disbursed $3.4 billion. The book value of investments...
Fresno/Clovis Water Management Plan
The Fresno/Clovis Metropolitan Area (FCMA) in California has historically relied solely on untreated, undisinfected groundwater as a source of potable water to serve 500,000 people. Contamination...
Use of a Statistical Model to Forecast Future Wastewater Flows
Future wastewater flows are generally predicted based upon an assumed rate of population and industry growth within a treatment facility's area of influence. In a community with limited...
Bellingham Frozen Foods Spray Irrigation System Operations
Bellingham Frozen Foods is a major vegetable processor located in northwestern Washington state. During the mid-1980's, the city of Bellingham began to upgrade the treatment of wastewater....
Designing in Three Dimensions for Manufacturing Facilities
Du Pont Engineering is using Three-Dimensional Design for the design of our manufacturing facilities. Our 3D design system was used on several projects in 1992, and full implementation...
Computing with Objects: What Does Industry Hope to Gain from it
Although the need for an integration of engineering tasks has been stressed for a long time, the success that we see in this regard is very limited. We believe that there is justified...
Advanced Construction Technology System
The Advanced Construction Technology System (ACTS) is a computer database for the classification, documentation, storage and retrieval of information about emerging construction technologies....
Computer Estimating & Cost Control History & Evolution at Perini
Computers have played an important role in the construction industry, particularly in estimation and cost control. With increasing number of personal computers, and software packages in...
Constructors' Approach to CIC Based on Preparation of Construction Production Information
To improve productivity in the construction industry; much research and development is being done - on CAD systems, construction management systems, robotics, computer graphics, etc. Many...
An Effective Estimate of the Percentage Completion of Construction Projects and Concomitant Progress Payments
This paper will discuss the methods of assistance to contractors in visualizing the effects of variations in the quantities of their work and how to obtain such information effectively....
Design Information Hierarchy for Construction Method Selection Process
The Construction Project Planning (CPP) stage is a critical stage for the success of a construction project. This stage lays the framework upon which most of the construction decisions...
Return to search