An Alternative Method to Mariotte Reservoir System for Maintaining Constant Hydraulic Pressure
Several problems with the Mariotte reservoir system were discovered when it was used to apply a constant water pressure as a boundary condition for a prolonged period. The constant-pressure...

Rebuilding Buried Pipelines Without Digging
Advances and refinements in trenchless reconstruction technologies now permit system rebuilding of gravity and low pressure pipelines without excavation. Through the use of cured-in-place...

Optimizing Urban Ground Water Supply Systems
The cost of Pumping comprises a major part of total water operation and maintenance expenses. Most utilities attempt to keep these costs down. However, there are areas of study that may...

Hydrodynamic Pressure on an Oscillating Vertical Plate
The hydrodynamic pressure on an oscillating vertical plate could be influenced by the effects of compressibility of fluids and surface waves. The compressibility is effective for higher...

Computation of Wind Flow Around a Building
A numerical investigation of wind flow around a three-dimensional building is presented by solving weakly compressible flow equations, together with Smogrinsky's subgrid-scale...

Non-Linear Passive Elastic Properties of the Left Ventricular Myocardium: Application of Finite Element Analysis to 3-D Geometry Obtained from Ultrasound Images
A finite element (FE) analysis and an optimization algorithm were employed to assess the nonlinear passive elastic properties of left ventricular myocardium in a canine mode. The three-dimensional...

In-Vitro Measurement of Static Contact Pressure Distribution in Synovial Joints
The objective of this presentation is, at first, to review the various approaches to the measurement of contact pressure distribution in synovial joints, and then to describe the development...

Material Testing at High Pressure
A static test cell has been designed and fabricated to apply a peak stress of up to 2 GPa to a 2.54 cm cylindrical specimen. The cell design was based on the 'belt'...

Up and Down Construction of a 17-Story Building
The One Westwood Building is located on a small site in the Westwood district of Los Angeles. Construction of the 17-story building with 8 levels of subterranean parking was complicated...

Hugo's Sturctural Damage in Puerto Rico
The results of a study of the wind damages caused by Hurricane Hugo is presented. Cases involving wood structures, industrial steel buildings, multistory reinforced concrete buildings,...

Effect of Wind on Coastal Construction in Florida
The State of Florida's tidal shoreline is 8,426 miles long. Both the east and the west coast of Florida is subjected to several coastal storms each year. The present study...

NDBC's Observations in the Coastal Zone
The National Data Buoy Center (NDBC) has been collecting data from coastal buoys since 1979. Measurements, taken each hour, include wind direction, wind speed, significant wave height,...

Effects of Fluid Accelerations on Sediment Transport in Surf Zones
Two hydraulic model tests were run in a wave flume using irregular waves to obtain detailed data on the cross-shore variations of the pressure gradient on a 1:20 smooth, impermeable slope....

Numerical Modelling of Lower Lias Rock Failures in the Coastal Cliffs of South Wales
A model has been developed to evaluate slope failure in the interbedded limestone and mudstone Lower Lias series which outcrop for some 30 km in coastal South Wales. Computer simulation...

Permeability of Cement Grout Plugs in Basaltic Rocks
Flow tests have been conducted on expansive cement grout plugs with diameters of 160 mm and 200 mm, and length-to-diameter ratios of one, in boreholes in basalt blocks, and in steel pipes....

Pressure-Time Flow Measurements Under Adverse Conditions
Theoretical analyses suggest that the pressure-time method is capable of accurately determining flow rate in the short, varying cross section, 'semi-scroll' penstocks...

Measurements of Time Lag in Concrete Gravity Dam Foundations
Uplift measurements from eight large concrete gravity dams show that the time lag between an increase in headwater level and a corresponding increase in uplift pressure is insignificant....

Three Dimensional Modeling of Concrete Dams with Cracks Using Boundary Element Methods
Determining uplift pressure distributions in cracks in a concrete dam requires coupling between crack hydraulics and the stresses and displacements occurring in the rock and the concrete...

Avoiding Vibration in Penstocks
One objective of this paper is to indicate the potential sources of pressure pulsations within a hydraulic conduit system and the range of forcing frequencies associated with these sources....

Pressure Control Studies for PG&E's 20 MW Grizzly Hydroelectric Project
The Pacific Gas and Electric Company's Grizzly Hydroelectric Project consists of a single 20 MW Francis turbine under 700 feet head located near the existing Bucks Creek Project....

 

 

 

 