Shallow Ocean Disposal of Contaminated Dredge Material
The contaminated dredged materials from harbors and waterways along heavily populated coastal areas such as Connecticut must often be disposed at shallow ocean sites. To isolate the contaminants...

An Investigation of the Alcatraz Disposal Site
The Alcatraz dredged material disposal site in San Francisco Bay is a dispersive site that is not intended to accumulate disposed sediment. However, the recent discovery of shoaling at...

Numerical Model Evaluation of Advance Maintenance
Improving and maintaining navigation harbors and channels is one of the key functions of the US Army Corps of Engineers. The present cost-sharing system and the increasing costs associated...

Sedimentation of Summit North Marina Connected to C&D Canal
Possible sedimentation problems at the proposed site of the Summit North Marina were investigated and reported. This brief paper summarizes the detailed results given in the report. The...

Dispersal of Dredged Material Disposal Plumes
An empirical model describes dispersal of dredged material disposal plumes in an urban estuary, Central Long Island Sound, during spring of 1983. The model uses in situ current meter data...

Modification of Meander Pattern Using Wing Dams
A sharp river bend and a highway bridge together create potentially hazardous conditions for all down-bound barge tows on the Mississippi River at Lansing, Iowa. The tendency of the river...

Gabon Mineral Port Planning
There has been increasing interest in the use of topping-off and top-loading vessel transport systems to ease the burden of expenditures for deepening harbors to fully load large vessels....

Pavement Design for a Break Bulk Terminal Yard
This paper discusses the practical application of mechanistic pavement design principles for a proposed 8. 1 ha break bulk cargo storage yard that is part of the Port of Portland's...

Tacoma Sea-Land Terminal: A Project Management Challenge
The Port of Tacoma completed a new two berth container terminal and intermodal yard for Sea-Land in May 1985 in only 26 months after signing a binding agreement. The project, which also...

Designing Marinas to Mitigate Impacts
The John Wayne Marina was permitted for construction only after certain design features were altered to accomodate major biological and water quality concerns. The moorage basin was relocated...

The Pacific Texas Pipeline Project?Deepwater Oil Terminal, Port of Los Angeles
This paper describes the implementation program and status of the Pacific Texas Pipeline Company project in the Port of Los Angeles. A brief description of this important 1. 6 billion,...

Planning for Deep-Draft Navigation Channels
This paper summarizes the trends in seaboard trade, the major commodities for the world, and the share captured by U. S. ports. The discussion includes the new developments of port planning...

Puget Sound Alluvium: A Challenge in Design of Pile Supported Port Facilities with Dredged Slopes
The geotechnical investigation, evaluations, and recommendations for the Port of Seattle Terminal 18/20 Improvement Project are described and compared with observed performance during...

National Port Issues
The adequacy of U. S. ports to meet the Nation's present and future needs was evaluated by a Committee of the Marine Board, National Research Council. The changing character...

Overdredging at Existing Gravity Structure
Pacific Elevators Ltd. decided to upgrade Berth No. 2 to handle ships up to 70,000 DWT. The difficulty was to maintain the support of the cribs after dredging of the berth to minus 45...

Underwater Compaction of Sand Fill During Placement
A system and related equipment have been developed, and tested on a recent dredged fill project, to compact sand, either clean or with limited silt, in lifts several feet in thickness...

Reservoir Sedimentation and Desilting in Taiwan
The island of Taiwan is infested with numerous flashy streams with steep slopes and huge sediment loads, thus, the major reservoirs have experienced heavy sediment deposit. The encroachment...

Sediment Penetration in Lakes as a Result of Dredged Material Disposal and River Sediment Loads
Pollutant transport within the coastal boundary layer is highly sensitive to the vertical current structure and to the magnitude of the vertical current, especially during upwelling and...

Dredged Spoil Storage Basin in the Coastal Waters Near Rotterdam
The maintenance dredging for the Rotterdam harbour area amounts to 23 million m**3 per year, 10 million m**3 of which is polluted to such an extent that a controlled storage is required....

Land Renewal with Topsoil from Clyde Port Dredgings
The paper examines the potential of using sediment dredged from the River Clyde estuary as a topsoil in land renewal. It presents results, to date (1986), of a study sponsored by the Scottish...

 

 

 

 