Optimal Design of Continuous Prestressed Concrete Girders
Design of continuous prestressed concrete girders with possibility of parabolically varying depth in each span is formulated in the form of a mathematical programming problem. The design...

Nonlinear Analysis of External Prestressed Bridges
Finite element formulations for analysis of the overall response of concrete bridge girders prestressed with external tendons is described. The analytical procedure includes several nonlinear...

Cable Stays Catch On
The three completed cable stayed bridges in the U.S.�Pasco-Kennewick in Washington, Luling-Destrehan in Louisiana and East Huntington in West Virginia�will soon be joined by another half...

Natural Language Processing and Computer Graphics for Engineering Design
This paper describes the development of a natural language processor for plate girder design. A natural language processor for engineering design may be described as a conceptual parser...

Interactive Bridge Optimization Program
This paper presents the development of a design methodology that includes the structural optimization process as an integrated component of girder bridge design. The optimization process...

Computer Simulation of the Overload Behavior of Steel Multigirder Bridges with Cracked Girders
Various approaches of determining the structural response of steel multigirder bridges with cracked girders are presented. It is noted that linear finite element packages with three dimensional...

Complexity in Concrete
Centrust Tower in Miami, Fla., is a $95 million, 37 story, 600,000 sq ft tower rising from one side of a block-square 11 story parking garage. Columns on the curved side of the triangular...

Experimental Assessment of Performance of Bridges
Among the papers in this book, five assessed the global bridge behavior and the three concentrated on bridge decks. The bridges assessed include prestressed steel plate girder and truss...

China Builds Record Bridge
China's Hanjiang Railway Bridge has a 1,000 ft (305 m) long main box girder and is the longest bridge of its type in the world. The steel box girder bridge is built with a...

Lift Bridge looks Like Sculpture
A lift bridge built in 1926 over the U.S. Canal at Kaukauna, Wis. was replaced by a sleek new lift bridge whose sculptured shape encloses all the machinery within welded steel box sections....

Hundreds of Bridges�Thousands of Cracks
In the past 10 years hundreds of welded steel bridges, most of them relatively new, have suffered thousands of cracks due to secondary stresses, that is, the cracks are caused by deflections...

Behavior and Strength of Stub-Girder Floor Systems
The paper presents a detailed evaluation of the behavior and strength characteristics of the stub-girder floor system. This is a composite girder and beam structure that integrates the...

Load-Carrying Capacity and Remaining Life of First-Built Composite Girder Bridge in Japan
Kanzaki Bridge, Osaka, Japan, was the first steel-concrete composite bridge built in 1953 to carry the Osaka Prefectural Road over Kanzaki River. The bridge was removed in 1978 after 25...

Design and Testing of a 400 Ft Span Plate Girder Bridge
The paper describes design features and testing of the Madawaska River Bridge. The bridge is unique in being the longest span plate girder bridge in Ontario, having continuous spans of...

Composite Bridge Design in Germany
A span length between 40 m and 12 m has been regarded as optimal up to the mid-60's for a composite design to compete with prestressed concrete or steel alternatives. With...

Application of Preflexed Composite Beams to Continuous Bridges
A preflexed beam is a type of concrete encased steel beam of which prestressing has been introduced in the lower flange concrete. Recently, the preflexed composite beams were applied to...

Recent Research on Composite Structures for Building and Bridge Applications
Continuing research has been carried out at Lehigh University on composite structural members, joints, and overall systems. This paper summarizes the results of research on four selected...

Record Bridge Replacement
Jacks Run Bridge had to be rebuilt in one year instead of the usual two to three. So the Pennsylvania Department of Transportation spearheaded the quickest replacement of a major bridge...

Design and Construction of Guideway: Vancouver Advanced Light Rapid Transit
The Vancouver Advanced Light Rapid Transit (ALRT), system consists of linear induction motor driven, light-weight cars automatically controlled operating over a 21. 4 km system from downtown...

Analysis of Cracking of I79 Bridge at Neville Island
A large crack was discovered to form in a girder of the I-79 Glenfield Bridge over the back channel of the Ohio River near Pittsburgh on January 28, 1977. A section of the girder containing...

 

 

 

 

Return to search