Drought Analysis in the Ohio River Basin
This study formulates the drought series, including drought occurrence time, duration, and deficit volume by the use of daily streamflows and a tracer level of one-half mean value. The...

Changing Hydrology - The Middle Mississippi River
Observed daily flow and stage at major stream gages on the middle Mississippi River are numerically and graphically analyzed to quantify and illustrate the magnitude and seasonality of...

Impact of Temperature on Columbia River Winter Floods
During the course of an extensive study of the Columbia River drainage to evaluate a major levee system near Portland Oregon, it was noted that flood runoff produced by winter storms with...

Automatic Calibration of Conceptual Rainfall-Runoff Models
An automatic calibration strategy applied to land and channel components of the National Weather Service River Forecast System is outlined. Aspects discussed include the objective function...

Fault-Tolerant Design for Data Acquisition and Flood Forecast Systems
An innovative fault tolerant flood warning system is currently being installed in the Passaic River Basin. The new system is designed to automatically tolerate the failure of major components...

The Wet Look
The collapse of the Schoharie Creek bridge drew attention to underwater inspection. Underwater inspection of bridges gives engineers a better understanding of the condition of the bridges....

Engineering a Corporate Statement
Frito-Lay National Headquarters, Plano, Tex., occupies a 218 acre site in a corporate office park that had been a cow pasture. It was unusual in having mature trees and a natural watercourse...

Sultan River Project Operation Study for the Sultan River Hydroelectric Project
The project will be operated to maximize energy production from the Sultan River within the operational constraints imposed by the water demand for the City of Everett and by the instream...

Small Hydropower Potential in Missouri
The hydropower potential of small head plants on the Gasconade River was investigated. Since, it is felt that small head plants will have less environmental impact, thus it will be more...

Design and Application of an Open-Loop Control System for Run of River Sites
This paper compares an open loop control system for variable geometry turbines to a closed loop system for fixed geometry turbines. The control systems were designed to operate three submersible...

Non-Federal Development at Corps Projects: Ohio River Division Experience
The paper presents the recent experience of the Ohio River Division of the Corps of Engineers (ORD) in non-federal development of the hydropower potential at existing Corps projects under...

Piedra Del Aguila�New Hydropower for Argentina
Construction commenced in early 1985 on the 1. 0 billion Piedra del Aguila Hydroelectric Project on the Rio Limay about 1200 km (750 mi) southwest of Buenos Aires, Argentina. The project...

Construction of Yellowtail Dam & Power Plant 63-65
The Yellowtail Unit of the Missouri River Basin project is located on the Bighorn River in south central Montana. The key feature of the unit is Yellowtail Dam which rises 525 ft. between...

The Sultan River Hydroelectric Project
It took almost 70 years and required over 100 separate local, state and federal permits, but in June 1984, development of the Sultan River was finally completed for the multi-purpose use...

Methodology for Optimization of Cascade Small Hydro
An accurate classification of small hydro sites is introduced. Class 'C' small hydro developments utilize favourable topographical and hydraulic gradients along...

Nanpil River Hydropower Project Pohnpei, Federated States of Micronesia
The Nanpil River Hydropower Project is a 1600 KW run-of-the-river hydropower project located on the tropical island of Pohnpei, Federated States of Micronesia. The hydropower project will...

Carmen-Smith Uprate & Modernization
The Carmen-Smith Powerhouse is located on the upper McKenzie River, 75 miles northeast of Eugene, Oregon. Carmen's two nearly identical 42. 1 MVA vertical hydroelectric turbine...

Analysis of Expanding the Wolf Creek Powerplant
The Nashville District, Corps of Engineers, is examining the feasibility of expanding the Wolf Creek powerplant to increase its peaking capability. The economic analysis of peaking expansions...

Renovation of the Shoshone Powerplant, Wyoming
Shoshone Powerplant and Buffalo Bill Dam are located on the Shoshone River approximately 5 miles (8. 1 km) west of Cody, Wyoming. The Powerplant was completed and the first two generating...

The Twlefth Street Project?Multiple Uses on the Falls of the James River
This paper is about a hydroelectric project that was not built. The project is located in Richmond, Virginia on the James River. Project civil works, water rights and adjacent land are...

 

 

 

 

Return to search