Coastal Groins and Nearshore Breakwaters
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers No. 6. This book provides guidance for the design and placement...

A League of Their Own
New baseball stadiums in Cleveland and Arlington, Tex., opening in April 1994, combine the nostalgia of traditional ballparks with state-of-the-art site planning and structural engineering....

Multimedia in Civil Engineering
Multimedia inspires so many claims and hype that it can be hard for engineers to figure out what's real and what's not. The truth is that multimedia holds great...

The Channel Tunnel: Larger Than Life, and Late
The Channel tunnel opens in May, but passenger service will be delayed while final testing on trains and electrical systems are completed. The English Channel tunnel crossing is the world's...

Microsurfacing Urban Pavements
A European maintenance technique called microsurfacing can add years to the service life of cracked, ravelled pavements--with minimal interruption to traffic and for less than half the...

Is It Necessary to Compromise Engineering Ethics to Remain Competitive in Today's Marketplace?
The test of time has shown that by maintaining high ethical values, one can succeed in any marketplace, no matter how competitive, says the winner of the 1993 Daniel W. Mead Essay Contest...

Flood Control vs. Flood Management
For the last 130 years, flood policy in the U.S. has been dominated by the belief that floods can be controlled by structural methods, such as levees, dikes and embankments. These efforts...

Graphical-Based Productivity Transient Investigation Using DISCO
Construction operations involve complex resource interactions and are typically performed in the field with exogenous factors such as inclement weather conditions and equipment breakdowns....

A PC-Based Stochastic Project Scheduling and Costing Module
Project delays and cost overruns are very common in construction industry. This may be back-traced significantly to non or ill treatment of uncertainties that overwhelm construction projects....

SCHEREC: SCHedule RECovery System
Creating a revised plan requires experience and significant time. To lessen the effort involved, a knowledge-based system named SCHEREC (SCHedule RECovery) was developed which suggests...

An Integrated Approach To Repetitive Construction Planning
Repetitive construction projects are unsuited for the use of the Critical Path Method (CPM) for their scheduling. Statistical simulation techniques offer a scheduling alternative, but...

Managing Uncertainty in Project Planning and Execution: Introduction and Overview
This paper provides an introduction and overview of topics that are relevant to project design and management under conditions of uncertainty, with an emphasis on civil engineering projects....

Quantification of Cost Uncertainties Using Neural Network Technique
This paper describes the development of a neural network system for forecasting cost escalation in construction. The input of the neural network system consists of factors that have an...

Interpretive and Modelling Problems of Risk and Uncertainty in Bidding Techniques
This paper considers the implementation of policy, strategic and tactical bidding and the processes of devolution of the risk and uncertainty in a corporate management context....

Range Estimating -- User-Friendly Risk Analysis
This paper introduces the reader to Range Estimating - a user-friendly decision technology for project cost risk analysis. Although developed with the non-statistician in mind, Range Estimating...

Startplan: Producing Schedule Templates Using IRMA
The Information Reference Model for AEC (IRMA) is a generic information modeling standard to support computer-integrated construction (CIC). Although IRMA is still in a conceptual stage,...

Construction Problem Solving in a Cooperative Distributed Agent Environment
This paper outlines the research being undertaken by the authors to determine how experts develop solutions to construction problems in a cooperative distributed agent environment which...

Intentions and Credences ? An Australian Approach to Computerised Building Regulation
In the past, computer representation of building regulations has addressed a series of prescriptive requirements. Compliance with each requirement was essential and the only relationship...

State and Resource Based Construction Process Simulation
Stroboscope is a programming language for construction process simulation. The programming language provides access to the state of the simulation and to the properties of resources. It...

Multi-Objective Optimization of Construction Schedules
This paper focuses on the multi-objective deterministic and stochastic modelling and optimization of construction tasks scheduling. Of particular importance is a frequency need to satisfy...

 

 

 

 

Return to search