Plant Modernization and its Role in the Efficient Use of Water Resources
Engineers and hydrologists alike are challenged with the task of developing hydro projects which satisfy a broad spectrum of criteria. Specific criteria employed by resource agencies and...

Sno Water Led Coordinated Water System Planning
The designation of a Critical Water Supply Service Area (CWSSA) which leads to Coordinated Water Planning evolved from problems recognized much earlier. Regional water suppliers in Snohomish...

3 Counties Coordinated Water System Plans
The Coordinated Water System Plan (CWSP) process is a state mandated management tool created to get agencies and utilities to jointly address problems of current and domestic/municipal...

The Department of Health's Role in Implementing the Coordination Act in North Snohomish County
A coordinated water system plan in north Snohomish County resulted in development of uniform minimum design standards, a decrease in the number of new small water systems and regional...

Ecological Considerations in Groundwater Management
A wide variety of potential effects of groundwater management on terrestrial vegetation and aquatic biota are described and illustrated with examples from California....

Assessment of TCE Concentration in South Tucson Water Network
This paper summarizes a study that estimated trichloroethylene (TCE) contamination patterns in a portion of the Tucson water distribution network due to several polluted wells. Aspects...

Groundwater Contaminant Transport at a Hazardous Waste Disposal Site, Pullman, Washington
Groundwater contamination at a hazardous waste site near Pullman, Washington is simulated by a numerical model. The aquifer at the site is classified as an unconfined valley aquifer. Solute...

Investigation and Rehabilitation of the Moses Lake Larson Wellfield
In 1988, low levels of trichloroethylene (TCE) were detected in several of the Larson wells operated by the City of Moses Lake. The wells are up to 800 feet deep and are completed in fractured...

The Strategic Development of a Sole Source Aquifer to Improve Water Quality While Minimizing Environmental Impact
A water supply project is currently underway which prevents future degradation of a sole source aquifer while providing a groundwater resource with limited usage restrictions. Salt water...

Developing, Managing, and Protecting Urban Aquifers in the Pacific Northwest
Water purveyors in the Puget Sound region have applied a variety of innovative techniques to effectively manage urban groundwater supplies from a quantity and quality perspective. Two...

Large-Scale Conjunctive Use of the San Gabriel Basin: An Environmentally Beneficial Water Supply Project
The 170-square-mile San Gabriel Basin in Los Angeles County, California, has commanded the attention of both water supply and environmental agencies because: (1) it is an idyllic natural...

The West Point Story?Chapter 1: Overview and Planning
The West Point wastewater treatment plant is the Seattle metropolitan area's largest wastewater treatment plant, and it is being upgraded to provide secondary treatment. The planning,...

The West Point Story?Chapter 2: Project Management Approach
In 1985, serving as the program lead, Metro contracted with Lewis Zimmerman Associates to conduct a formal facility planning effort for the West Point wastewater treatment plant. It was...

The West Point Story?Chapter 3: An Integrated Park and Treatment Plant
The West Point Wastewater treatment plant in Seattle sits on a small parcel of land that juts out into Puget Sound. In 1984, controversy erupted when Seattle Metro recognized that West...

The West Point Story?Chapter 4: Design
Metro's approach to design was one of integrated environmental and plant design. The project team, with guidance from the community and the city's parks department, established goals before...

The West Point Story?Chapter 5: Construction
As design of the West Point plant neared completion, the municipality of Seattle addressed construction of the facilities. The challenge was to build a complex wastewater treatment plant...

Upper Guadalupe River Authority, Texas?Innovative Solution to Long-Term Water Needs
Through conjunctive use of groundwater and surface water, the Upper Guadalupe River Authority (UGRA) has designed a water supply system for the City of Kerrville, Texas that saves 80 percent...

Small Area Water Demand Forecasting at the Salt River Project
The Salt River Project Small Area Water Demand Forecast (forecast) is designed to provide water resource planners with long-range water demand forecasts disaggregated by user type and...

A Comparison of Short Term Forecast Methods for Municipal Water Use
Water utilities routinely develop long range demand forecasts for use in the normal planning activities. In recent years, many utilities have sought to develop more short-term demand forecasts...

Water Use Pattern of Residential and Commercial Customers
The availability of the Automatic Meter Reading (AMR) devices make it possible to read a large number of meters in a short period of time. Through the use of AMR, we monitored weekly water...

 

 

 

 

Return to search