TVA Cuts Deep Slot in Dam, Ends Cracking Problem
In 1972, cracking in the concrete dam at TVA's Fontana project embarked TVA on a four-year program of investigation, analysis and repair. Thermal expansion in the downstream...
Field Control Replaces Design Conservation At World's Largest Underground Powerhouse
The excavation of 16,000,000 yd� of rock at LG-2, part of the La Grande hydropower project in Canada, has been completed. The world's largest underground powerhouse, with...
Trench Cave-In: Contractor's Responsibility
The article Can Trench Cave-In Deaths Be Cut� in CIVIL ENGINEERING�ASCE, September 1977, states that the owner's engineer should accept responsibility for the design of temporary...
Major Cause of Earthquake Damage is Ground Failure
Ground failure is one of the most destructive effects of large earthquakes. For example, about 60% of the damage during the 1964 Alaska earthquake was a consequence of ground failure....
Isn't a Subway for Washington, D.C., Just the Thing�
After 100 years of dreaming and 10 years of design and construction, more than 22 miles and 28 stations of the Washington, D.C., Metro are now in revenue operation. When completed in 1983,...
Small Midwestern Consultant Introduces Inhouse Desk Top Computer
This article traces the history of engineering and surveying calculations in a small civil-geotechnical consulting office in Rock Island, Ill., W.J. Reese & Associates. The expanding...
Mechanization Speeds Limestone Production
The Dravo Lime Company's limestone mine and processing facility was nominated for an Outstanding Civil Engineering Award because it is a well-planned and executed construction...
Aerated-Pile Composting: A Promising New Alternative for Sewage Sludge Disposal
In the past several years, traditional methods of sludge disposal such as incineration and ocean dumping have come under fire from environmental groups and the EPA. This has sparked a...
Single Additive for Recycling Asphalt Pavements
A design concept for recycling deteriorated asphalt pavements using a single reclaiming agent has been developed. The article established guidelines to help engineers determine the physical...
Energy Facilities Going Underground
Environmental pressures, combined with continuing development of hard-rock excavation techniques, have turned attention to the placement of major engineering facilities underground. Primary...
Geotechnical Practice for Disposal of Solid Waste Materials
The papers for this conference are grouped under the themes of four of the general sessions: 1) Geotechnical properties affecting disposal and utilization; 2) utilization in dams, embankments,...
Pitfalls of Overconservatism in Geotechnical Engineering
The article cites at least three reasons why geotechnical engineers may be overconservative: (1) They may try to satisfy unreasonable standards established by themselves or others; (2)...
Mammoth Transshipment Terminal Links Montana Coal to Michigan Power Plant
In 1973 Detroit Edison contracted with the Decker Coal Company for 200 million tons (181 Tg) of Western low-sulphur coal over a period of 26 years to meet its requirement for low-cost,...
Kamburu Dam: Diversion Conduit Designed into Spillway Saves $1,000,000
Careful coordination of dam construction operation with river stages over several seasons, and a construction sequence that called for building the spillway, in effect, from the top down,...
Channel Siltation Determined with Side-Scan Radar
Of the new electronic means to measure water depth, side-scan sonar is unusual in that it gives not just a cross-section of the bottom but a semi-3-D picture of the bottom surface. Experienced...
Terrain Analysis for the Trans-Alaska Pipeline
Airphoto interpretation and field reconnaissance were combined with a computer-based data bank to evaluate the diverse terrain conditions along the Trans-Alaska Pipeline because acquisition...
Teton Dam Failure
In June 1976, Teton Dam in Idaho failed. It was an earthfill dam 305 ft high. It failed by piping through the impermeable core of the dam. Among factors believed contributing to failure:...
The Story of Cement, Concrete and Reinforced Concrete
When the dawn of history, man has sought for materials to cement stone and brick together. When rebuilding the Eddystone lighthouse in 1756, John Smeaton recognized ordinary lime morter...
Rock Engineering for Foundations & Slopes
Proceedings of a specialty conference on Rock Engineering for Foundations and Slopes, held in University of Colorado, Boulder, Colorado, August 15-18, 1976. Sponsored by the Geotechnical...
Award-Winning ASCE Papers in Geotechnical Engineering 1950-1959
Papers, Discussions, and Closures from ASCE Proceedings and Journal of the Soil Mechanics and Foundations Division
This collection of papers covers a broad range of relevant issues in geotechnical engineering. Topics include capillary phenomena in cohesive soils, final foundation treatment at Hoover...