A Work Packaging Process Model for Petrochemical Plant Piping Construction
This paper presents a model for the current work packaging process for petrochemical plant piping construction. The basic foundation of the model is formed by identifying major decision...

Linear Scheduling: A Practical Implementation
This paper describes the features and use of a family of planning structures that provides the basis for a superset of the traditional critical path method which includes linear scheduling....

Resource Leveling Based on the Modified Minimum Moment Heuristic
CPMLevel is an MS Windows computer program that utilizes the minimum moment algorithm to smooth the histogram of a resource in both traditional and overlapped CPM networks. It has interactive...

ICPS: Integrated Construction Planning System by Object-Oriented Planning Models
Knowledge processing for integrated building system planning and construction system planning poses challenging problems to integrate design and construction process efficiently. While...

An Automated Cost Planning System (ACPS) for Construction Projects
This paper suggests an automated cost planning system (ACPS) for planning and scheduling construction projects. The major objective of this system is to further the use of CPM as a planning...

Multiple Objectives, Uncertainty and Routing Decisions for Hazardous Materials Shipments
Explicit consideration of multiple objectives and uncertainty is important in hazardous materials transportation, particularly in regulating routes or making routing decisions. Application...

Computerized Approach for Forecasting the Rate of Cost Escalation
This paper reviews the treatment of escalation in construction costs. The causes of escalation are outlined and the effect of escalation on the contractor and the owner is discussed. Various...

Computer Estimating & Cost Control History & Evolution at Perini
Computers have played an important role in the construction industry, particularly in estimation and cost control. With increasing number of personal computers, and software packages in...

Conceptual Cost Estimating: A Hybrid Neural-Expert System Approach
This paper presents a hybrid neural-expert system approach for developing conceptual cost estimates based on historical data of construction projects. The proposed hybrid neural-expert...

An Integrated Computer-Based Total Design Environment for Civil Engineering Education
The nature of design within the professional practice of civil engineering today, combined with the curricular and content requirements for design of the Accreditation Board for Engineering...

Constructors' Approach to CIC Based on Preparation of Construction Production Information
To improve productivity in the construction industry; much research and development is being done - on CAD systems, construction management systems, robotics, computer graphics, etc. Many...

Using Finite Element Analysis to Derive the Coefficient of Subgrade Reaction
The coefficient subgrade reaction is a concept used to generate spring constants which are commonly used to model the foundation subgrade in the analysis of mat foundations. This paper...

The Hybrid Solution Approach of ESBE
ESBE is the hybrid object-oriented expert system for the optimization of construction site layout. The task is the dimensioning and the arrangement of the individual construction site...

An Entity Relationship Model of Construction Project Data
The purpose of this paper is to demonstrate the results of applying techniques of information systems development to an application area that is diverse and complex but which is exploring...

An Automated Database System for Construction Bidding
A number of probability-based bidding models have been developed to assist a contractor in preparing bids that improve chances of winning over the competition. Models based on utility...

Adaptive, Multi-Resolution Modeling of Construction Plans
The process of developing a construction plan is complex, taking many considerations and constraints into account. In contrast, the CPM paradigm of planning allows only the results of...

An Effective Estimate of the Percentage Completion of Construction Projects and Concomitant Progress Payments
This paper will discuss the methods of assistance to contractors in visualizing the effects of variations in the quantities of their work and how to obtain such information effectively....

Filing of Construction Photos Linked with Database
In order to raise the added value of construction information, a filing system of construction pictures is built up and is used theoretically linked with a database. Here, conditions set...

Design Information Hierarchy for Construction Method Selection Process
The Construction Project Planning (CPP) stage is a critical stage for the success of a construction project. This stage lays the framework upon which most of the construction decisions...

Optimum Design Software Package for Shortening Civil Engineering Construction Period
The optimum software package for engineering network has adopted a coverage technology to facilitate an analysis of large-sized projects. This package has the following functions: (1)...

 

 

 

 