A Perspective on Landslide Dams
The most common types of mass movements that form landslide dams are rock and soil slumps and slides; mud, debris, and earth flows: and rock and debris avalanches. The most common initiation...

Landslide Dammed Lakes at Mount St. Helens, Washington
The collapse of the north face of Mount St. Helens on May 18, 1980, and the debris avalanche that resulted blocked outflow from Spirit Lake and Coldwater and South Fork Castle Creeks....

Design and Construction of the Spirit Lake Outlet Tunnel, Mount St. Helens, Washington
In 1982, a governmental task force was formed to evaluate the hazard posed by the blockage of Spirit Lake that resulted from the eruption of Mount St. Helens in May 1980. An analysis was...

The 1983 Landslide Dam at Thistle, Utah
The Thistle, Utah, landslide began rapid movement on April 13, 1983. The landslide, a reactivation of an estimated 22 multiplied by 10**6 m**3 of old landslide debris, blocked Spanish...

Control of Thistle Lake, Utah
In April of 1983, the Thistle slide blocked the flow of the Spanish Fork River and traffic using the Denver and Rio Grande Western Railroad, U. S. Highway 89, and U. S. Highway 50 and...

Landslide Damming in the Cordillera of Western Canada
Major landslide dams in the Cordillera are a result of rock slope movements, landslides in stratified Pleistocene deposits, and landslides in till or colluvium in steep mountain watersheds....

Landslide Dams in Japan
Damming of rivers by landslides is common in Japan because widespread unstable slopes and narrow valleys exist in conjunction with frequent hydrologic, volcanic, and seismic landslide...

Landslide Dams in South-Central China
The Yangtze and Yellow Rivers and their tributaries drain mountainous areas of south-central China that are highly susceptible to landslide activity. This paper describes six major cases...

Fault Diagnosis of Hazardous Waste Incineration Facilities Using a Fuzzy Expert System
The use of an expert system along with fuzzy fault tree analysis is discussed in connection with fault diagnosis of a hazardous waste incineration facility. This fault tree is a diagrammatic...

New Techniques in Forced Vibration Testing
Forced vibration testing is a well established technique as indicated by references 1 to 8. This paper describes a system for forced vibration testing developed over two years during work...

Sequential Earthquake Response of an Earth Dam
Sequential earthquake-response records of the well-instrumented Long Valley earth dam (Mammoth Lake area in California) are analyzed and engineering interpretations are made. The dam,...

Monitoring a Bridge's Pulse
The Sunshine Skyway Bridge, which collapsed in 1980, is being replaced by the Florida Department of Transportation. The new Sunshine Skyway Bridge, which spans Tampa Bay between Bradenton...

Expansion of the Electro-Coal Transfer Terminal
This paper briefly describes renovation and expansion of the coal and phosphate marine terminal in Davant, La. The program included: replacement of existing berths damaged by marine accident;...

Forensic Engineering
Learning from Failures
The activities and qualifications of the Forensic Engineer are summarized in the nine papers published in this book. Procedures for failure investigation are discussed along with failure...

Landslide Dams
Processes, Risk, and Mitigation
Landslide dams have proved to be both interesting natural phenomena and significant hazards in many areas of the world. A few of these blockages attain heights and volumes that rival or...

Plugging into a Dam
Instruments are embedded into hundreds to dams around the world. But for instrumentation to be effective, the instruments must be read, and the data must be plotted and compared to predicted...

Borehole Shear Test and Slope Stability
Three Iowa landslides analyzed on the basis of Borehole Shear Test (BST) data are reported. The soils included CL and ML loess and glacial till, and CH clay shale. Back-calculations from...

Rehabilitation of Blackfoot Dam In-Situ Testing and Analysis
The dam was constructed in 1909 and was recently found to require rehabilitation to enlarge the spillway and improve embankment stability against the large earthquake potential in the...

Vane Shear Testing for Staged Construction
Staged construction was used for the earthfill embankment of Birch Dam in order to compensate for low strength clays in the foundation. Sampling and testing of foundation soils verified...

New Approaches to Rehabbing Old Dams
The U.S. Bureau of Reclamation takes a look at several new ways of building old dams for maximum flooding. A labyrinth spillway was built at Ute Dam near Logan, N.M. to increase reservoir...

 

 

 

 

Return to search