Bay Ridge, Anne Arundel County, Maryland Offshore Breakwater and Beach Fill Design
Construction of the Bay Ridge shoreline protection project was completed in July 1991 and consists of eleven offshore segmented breakwaters with beach fill. The breakwaters, located about...
Chesapeake Bay Field Modeling and Monitoring Projects
'Traditional' erosion control measures often do not meet the corps of Engineers' requirement for economic justification. The costs of these measures are much greater than the benefits...
Laupahoehoe Harbor Planning, Design, & Construction
Laupahoehoe Harbor provides access to the fertile fishing grounds along the northeast or Hamakua coast of the island of Hawaii, Hawaii. The planning, design, and construction of Laupahoehoe...
Military Techniques for Expedient Repair of Earthquake Damaged Harbor Infrastructure
Logistical support of military forces in the theater of operations during conventional warfare by shipment of large volumes of containerized cargo requires sustained use of strategic port...
Design and Construction of Shinnecock Inlet, New York
Shinnecock Inlet is the easternmost of six coastal inlet which bracket the barrier island on the south shore of Long Island, New York. Through recent history, Shinnecock Inlet has exhibited...
South Jetty Scour Hole Stabilization, Ocean City, Maryland
Formation of a scour hole along the inlet side of the South Jetty at Ocean City occurred after jetty construction as a result of ebb tidal flow in the inlet. Analysis of historical bathymetry...
Design Considerations for Small Artificial Islands in Franks Tract, California
Small, artificially-created islands may provide significant recreation and habitat benefits. Costs, however, can also be high. The initial dollar cost of creating an artificial island,...
Value Engineering in Coastal Design
A formal procedure of value engineering can be applied to coastal design to refine a design and reduce the construction costs. Despite the relatively simple technology and materials used...
Environmental Impact Analysis of Coastal Projects
It is fairly routine to describe the range of impacts that might occur as a result of a proposed improvement, but problems and controversy often accompany attempts to answer the more pressing...
Sandbridge Virginia Oceanfront Seawall Arbitration Hearing: Some Lessons Learned for Coastal Engineers
A group of beach property homeowners claimed that their new oceanfront seawall was defective in design. A beefed-up design cost about $1.3 million more and they sought this amount from...
Cost Effective Risk Allocation for Coastal Engineering Projects
Project participants will benefit significantly by routinely taking a more systematic, structured, and global view of risk than is sometimes done at present. Enhanced and broadened cognizance...
Our Aging Coastal Infrastructure
The River and Harbor Act of 26 May 1824, signed by President James Monroe, authorized the first involvement of the United States Federal government in the construction of harbor works...
Engineering a Monument, Evoking a Nightmare
Rather than simply standing as a backdrop for exhibits, the $53.2 million U.S. Holocaust Memorial Museum is intended to be part of the fabric of the exhibition itself. Now under construction...
A New Fast Track for Public Works
Most public contracts are still awarded to the lowest bidder, but some states are experimenting with other approaches for complex projects. In Oregon, officials facing a tight deadline...
Simulated Field Trials of Non-Destructive Concrete Test Methods for Highway Structures
The data presented results from a two year Strategic Highway Research Program investigation into suitable NDT methods for determining the early age, and residual strengths of highway structures....
Reassessing the Risk Assessment
Risk assessments should help an engineer determine cost-effective remedies to environmental pollution. Unfortunately, most don't. Most assessments drastically overestimate...
Landfills: Anatomy of Automated Design
California's 360 acre Bee Canyon landfill (completed last year) sits amid a complicated network of narrow canyons with side slopes 300 ft high. As with most landfill projects,...
Howdy, Partner
Litigation has long been a nemesis to the construction industry. In recent years, contractors and owners have used innovative alternative dispute resolution (ADR) techniques, such as arbitration,...
Value Engineering at a Superfund Site
The Helen Kramer Landfill ranked fourth on the EPA's National Priorities List and the estimated cost of clean up was about $39 million. By value engineering selected parts...
Piles Over Problems Sites
It's increasingly difficult to find suitable space for construction in urban areas. Pile foundations can fill the void by making questionable and heavily regulated sites,...