Alternative Fuels and Institutional Reform
The actions that Mexico City Government is currently implementing is addressed. The altitude and topography of the Mexico City valley contribute to less efficient combustion, trapping...

Development of Transit Capacity and Quality of Service Manual
A study was conducted to develop updated principles, practices, and procedures for transit capacity and quality of service. Such a study focuses on developing a new Transit Capacity and...

AIR-21
The Aviation Investment and Reform Act for the 21st Century (AIR-21) spans a five year period, reauthorizing the Federal Aviation Administration and the Airport Improvement Program (AIP)....

The Digital Evolution
As designers such as Gehry Architects dream up ever-more fluid and sculptural shapes for buildings, the only way to turn those aesthetic shapes into solid, safe structures is by using...

Effective Analysis of Diaphragm Walls
Prepared by the Technical Committee on Performance of Structures during Construction of the Structural Engineering Institute of ASCE. This report presents...

Smart Sign Support
The Route 80-MAGIC (Metropolitan Area Guidance, Information and Control) project is considered to be the showcase Intelligent Transportation System (ITS) project for the state of New Jersey....

Examining the Capitol Dome
The dome of the United States Capitol, designed and built from the 1850s to the 1860s, is a masterpiece of 19th-century engineering and construction. The majority of the dome is made of...

Design Live Loads for Parking Garages
The objective of this research project is to obtain a better understanding of parking garage live loads and to recommend an appropriate value for design. A load survey was conducted in...

Flight Path Precision
Air traffic delays at the four airports operated by the Port Authority of New York and New Jersey are among the most severe and costly in the nation. A study by the Port Authority proposes...

Airport Modeling and Simulation
This proceedings, Airport Modeling and Simulation contains papers presented at the conference held in Arlington, Virginia, August 17-20, 1997....

Early Warning System
The Rock Hazard Rating System (RHRS) can help highway owners mitigate the risks of rock slope failure. This system helps owners determine which slopes are most hazardous and should be...

Analysis, Design, Construction, and Testing of Deep Foundations
This proceedings, Analysis, Design, Construction, and Testing of Deep Foundations, consists of papers presented at the OTRC `99 Conference...

Case Studies in Optimal Design and Maintenance Planning of Civil Infrastructure Systems
Sponsored by the Structural Engineering Institute of ASCE. This collection contains 19 papers on the optimal design and maintenance planning of civil...

Structural Engineering in the 21st Century
This proceedings, Structural Engineering in the 21st Century, contains papers presented at the 1999 New Orleans Structures Congress held on...

Order Amid Uncertainty (Available in Geoenvironmental special issue only)
Bayesian statistical methods allow engineers to deduce probabilities from incomplete information. If there is a theoretical or empirical reason why a particular probability distribution...

Del Webb's Innovative Approach to Master-Planned Community Development
(No paper) The Del Webb Corporation is currently building a master planned development on the northern edge of Maricopa County. The development plan includes a water campus housing a water...

Evaluation of a Soil Vapor Extraction System: A Post-Audit Assessment
(No paper) Numerous sites contaminated with volatile organic compounds (VOC) have implemented soil vapor extraction (SVE) systems to remediate the unsaturated zone. The SVE systems have...

Urban Runoff Toxicity
Toxicity is controlled by the magnitude/concentration of the contaminant produced in an exposure, the duration of the exposure, and the frequency with which exposures are repeated. When...

Impacts of CSO Swirl Concentrator on Dissolved Oxygen Concentrations in the Anacostia River
Purpose: To assess impacts of the CSO control, two continuous monitoring stations were located upstream and downstream from the CSO outfall. The monitors recorded dissolved oxygen (DO),...

Selection of an Optimal Ecosystem Restoration Plan: Decision-Making Criteria in the Planning Process
(No paper) This paper explores various decision criteria for restoration projects and how they may be modeled with existing decision models. Cost-effectiveness, incremental cost analyses,...

 

 

 

 

Return to search