Computing with Objects: What Does Industry Hope to Gain from it
Although the need for an integration of engineering tasks has been stressed for a long time, the success that we see in this regard is very limited. We believe that there is justified...

A Model to Quantify Work Space Availability for Space?Contrained Scheduling Within a CAD Environment
In any given process work area, a task or activity requires a specific amount of space for its execution. This required space must be accommodate by the physical space of the work area...

A CAD-Based Construction Simulation Tool Kit for Construction Planning
Current planning and scheduling techniques place considerable reliance on the planners judgement, imagination and intuition. The result of such techniques is typically lengthy text reports...

CAD Applications for Material Handling in the Construction Environment
Research at Va. Tech in the area of dynamic behavior modeling and crane damping have been undertaken. The dynamic behavior modeling capability has been designed to us 3-D CAD models and...

Knowledge and Information Processing with Drawing Objects in Construction Phase
Knowledge processing by CAD systems poses challenging problems for the efficient integration of design and construction processes. While CAD systems have been applied to various phases...

Comprehensive Site Monitoring Through Model Based Reasoning
The authors of this paper have developed a computer object oriented intelligent construction site modeler which is dynamically linked to a 3D CAD system. Model Based Reasoning is used...

Advanced Construction Technology System
The Advanced Construction Technology System (ACTS) is a computer database for the classification, documentation, storage and retrieval of information about emerging construction technologies....

Finite Element Analysis and Design of Bridges with Applicatrons of ICAD
This paper describes applications of client-server models, interprocess communications (IPC), and concepts of intelligent CAD (ICAD) to the interactive design and analysis of highway bridge...

Safety of Passengers on Railway Platforms?Using Various Computers
Recently, it has become very important to take measures to improve platform safety in Japan. Many passengers use railway platforms all day long (from the first train to the last train)....

The Automation of Freeway Ramp Junctions Analysis
Congestion on urban freeways has been steadily increasing. In contrast, capacity expansion, by means of constructing new roadways, has not kept pace with the growth in demand. The primary...

Managing AutoCAD and Intergraph MicroStation Systems
The reality today is that Computer Aided Design information is being transferred from one CAD system to another. More often, sharing CAD information among the design team requires multiple...

Recommendations for the Design of CAD User Interfaces
The user interface of a CAD system appears to the users to be the system itself. Thus its design is very important. For this reason the committee 4.2.1 'Computer Aided Design' of the Gesellschaft...

3D Template of Human Figure for CG Animation in Design
It has become commonplace to use computer graphics (CG) animation in architectural and landscape design. Historically, CG animation has been employed primarily as one of many presentation...

Object Based Visualization of Physical Behavior
In engineering science, the physical behavior of solids, fluids, gases and multiphase systems is analyzed with computational models. Numerical methods form the basis of the computational...

An Object Oriented Approach to Computing with Structural Components
The structural analysis process can be modeled in two separate steps: definition of structural systems and analysis of a discrete numerical model; the transmission between these two models...

Computer-Aided Decision Model for Selecting a Contractual System
An owner of a construction project often faces the problem of selecting a contractual arrangement. The process of selecting a contractual system depends on the owner's preferred risk sharing...

A Work Packaging Process Model for Petrochemical Plant Piping Construction
This paper presents a model for the current work packaging process for petrochemical plant piping construction. The basic foundation of the model is formed by identifying major decision...

Linear Scheduling: A Practical Implementation
This paper describes the features and use of a family of planning structures that provides the basis for a superset of the traditional critical path method which includes linear scheduling....

Resource Leveling Based on the Modified Minimum Moment Heuristic
CPMLevel is an MS Windows computer program that utilizes the minimum moment algorithm to smooth the histogram of a resource in both traditional and overlapped CPM networks. It has interactive...

ICPS: Integrated Construction Planning System by Object-Oriented Planning Models
Knowledge processing for integrated building system planning and construction system planning poses challenging problems to integrate design and construction process efficiently. While...

 

 

 

 

Return to search