Toronto's Tunnel Solution (Available in the Geoenvironmental Special Section only)
The Toronto Transit Commission (TTC), one of the largest public transportation systems in North America, carries more than 1,000,000 commuters a day. The TTC's tunnels had...

Monitoring the Fresh Kills Landfill (Available in the Geoenvironmental Special Section only)
A unique system has been developed to assess the stability of the Fresh Kills Landfill, in New York City, using more than 260 geotechnical instruments and automatic processes. The system...

Communicating in a Crisis
As professionals following the strictest ethical standards, civil engineers are entrusted with safety and well-being of the public, regardless of the scale or range of their designs. By...

Saving the Williamsburg Bridge
The Williamsburg Bridge, which has connected Brooklyn to Manhattan for more than 97 years, is midway through an ambitious 14-year, $800-million reconstruction that will save the venerable...

Fast TRAX
The Utah Transit Authority (UTA) completed its 15 mi (24 km), 16-station light-rail transit system, called TRAX, 13 months ahead of schedule and more than $20 million under budget. The...

Rapid Expansion
Dallas Area Rapid Transit (DART) is undertaking an ambitious light-rail expansion program. It already operates a 20 mi (32 km) light-rail starter system in the city of Dallas. Under construction...

Safeguarding Los Alamos
A forest fire that burned 48,000 ac (19,500 ha) around the Los Alamos National Laboratory, in New Mexico, in May 2000, created another problem for one of the nation's most...

Blocking the Tide
The city of Venice is in peril as a result of increased tidal flooding, and a proposed system of movable gates offers the greatest promise of safeguarding the city's future....

Examining the Capitol Dome
The dome of the United States Capitol, designed and built from the 1850s to the 1860s, is a masterpiece of 19th-century engineering and construction. The majority of the dome is made of...

On the Question of Accepting Work Outside One's Field of Expertise: An Ethical Fail Safe
The winner of the Daniel W. Mead Prize for ethical writing by a student discusses the history of the development of ASCE's code of ethics. Although it may be legal for civil...

Competence or Collapse
Gottshall, the winner of ASCE's Daniel W. Mead Prize for a paper on ethics by younger members, refers to the large-scale damage from recent earthquakes in Turkey as well as...

Judgment and Innovation
The Heritage and Future of the Geotechnical Engineering Profession
This book contains six papers of timeless value from some of the most experienced leaders of the geotechnical engineering profession. The papers reflect over 250 years of collective geotechnical...

Quality in the Constructed Project
A Guide for Owners, Designers, and Constructors
This Second Edition of Quality in the Constructed Project: A Guide for Owners, Designers, and Constructors (ASCE Manual No. 73) provides information...

Transportation Planning and Air Quality IV
Persistent Problems and Promising Solutions
This proceedings, Transportation Planning and Air Quality IV, consists of papers presented at the conference held in Lake Lanier, Georgia,...

Verdict Rendered
After the Grays Harbor County Courthouse in Montesano, Washington, was severely damaged by an earthquake in 1999, the surrounding community decided to preserve it. A design/build approach...

Quality Check
Composite materials, also known as fiber reinforced polymers (FRPs), have traditionally been reserved for aerospace engineering applications because of their high cost. FRPs'...

The Viable Alternative
The Benicia-Martinez Bridge is a high-level, welded deck truss bridge that carries Interstate 680 over the eastern end of the Carquinez Strait near San Francisco. To bring the bridge into...

Branching Out
For small engineering firm owners who are interested in enlarging their businesses, adding a new service of specialty is a good way to satisfy clients and keep up with the competition....

Golden Gate Update
A comprehensive seismic retrofit is under way to ensure that San Francisco's 2.74-km-long Golden Gate Bridge will remain in operation even after a maximum credible earthquake...

The Penstock Puzzle
After 40 years of chronic slope movements and several engineering studies, the Sacramento Municipal Utility District in California signed a design-build contract to stabilize the 1,500...

 

 

 

 

Return to search