PCB Contaminated Sediments from Petit-de-Grat, Canada
In Canada, ocean disposal of dredged materials is regulated by the Ocean Dumping Control Act. Included within the schedules of regulated substances are organochlorine compounds, such as...
Effects of High Sediment Concentrations on Velocity and Sediment Distributions
Several classifications are required to describe sediment-transporting flow. The flow may be turbulent or laminar, Newtonian or non-Newtonian, and may also have a uniform or nonuniform...
High Sediment Concentrations Require High In-Channel/Supply of Sediment
Flows with high sediment concentrations (greater than 10 percent by weight) most commonly occur either as debris flows in steep channels throughout the world, or as hyperconcentrated flows...
Flow Parameters of Fluid Mud
A set of small-scale, high-resolution velocity and stress sensors based on rugged metal-clad hot wires and epoxy-encapsulated hot films is to be evaluated for its performance characteristics...
Effects of Fines in Gravel Bed Streams Behavior
A model-gravel bed stream is studied in the laboratory. Flow visualization of bedload motion correlates with bursting phenomena near the bed. The bedload variation as a result of the addition...
Movement of Tractive Sediment from Disturbed Lands
The Smoky Creek basin of the coal area of northeastern Tennessee shows extensive evidence of tractive movement of coarse sediment from mined tributary basins into the main channel. Coal-rich...
Numerical Model of Mississippi River at Lock and Dam 26
Replacement work was initiated in November 1979. The first stage cofferdam constricted about half of the river channel. As a result, the flow velocity at the constriction increased causing...
Incipient Resuspension of Silt-Clay Sediment
The laboratory study of incipient motion of fine-grained cohesive sediment under oscillatory flow, unidirectional flow and the combined effects of oscillatory and unidirectional flow is...
Scour and Fill Monitoring at Lock and Dam No. 26 (Replacement), Mississippi River
Information gathered during construction of the first stage dam is presented. The information consists of data indicating flows and stages along with data obtained from surveys which monitor...
Sedimentation Study for the Rochester, Minnesota, Flood-Control Project
In a cooperative effort, the U. S. Army Engineer District, St. Paul (NCS), and the Soil Conservation Service (SCS) planned a combined flood-control project. The SCS portion of the project...
Numerical Simulation of the Bed Armoring Process
The stability of a river channel depends to a great extent on sediment characteristics. If the amount of sediment coming into a given reach for some reason becomes less than the river's...
Water and Sediment Movement in Irrigation Furrows
Water movement in an irrigation furrow is simulated by numerically solving the governing equations of continuity and momentum for unsteady, spacially varied flow in a pervious bed open...
Intake-Shoaling and Pump-Vibration Problems
Iowa Generation's Council Bluffs Unit 3 circulating water-intake structure has experienced two major problems: (1) formation of sand bars in front of the trash racks during...
Modeling of a Multifunctional Hydraulic Structure
A 1:12 scale Froude model of a hydraulic control structure in the Rochester Combined Sewer Overflow Abatement Program (RCSOAP) was constructed and tested to optimize the design requirements...
Streamflow Measurement and Analysis for Northwest Rangelands
Watershed hydrologic and sedimentation investigations on the Reynolds Creek Experimental Watershed in southwest Idaho were initiated in 1960. Major objectives of the watershed research...
Decreases in Runoff and Sediment Yield by Drainage
Runoff and sediment yield from three small agricultural watersheds were measured during four winter rainfall seasons. Following two rainfall seasons of data collection, a subsurface drainage...
Modeling Analysis for Management of Artificial Recharge
The objective of these groundwater and sediment modeling studies is to determine the net change in storage and potentiometric levels within the Bunker Hill Groundwater Basin resulting...
Artificially Varied Flow: River System Management
Some of the major water quality problems are heat, color, organic sediment, and total dissolved solids. To dilute these and other pollutants, substantial augmentation of flows for water...
LTER and Management of the Upper Mississippi River
The Upper Mississippi River is managed for multiple use by two federal agencies and five states. System management objectives include commercial navigation, commercial fisheries, minimum...
Effects of Resource Development on Water Quality in the Big South Fork National River and Recreation Area, Tennessee and Kentucky
The South Fork Cumberland River begins in Tennessee at the confluence of the New River and Clear Fork. Strip mining for coal in the New River basin has been ongoing for decades with little...
Return to search