Federal Vs. Non-Federal Hydroelectric Development
This paper presents the methodology and results of economic and financial analyses that were performed to indicate the optimum size powerplants that would be constructed assuming Federal...

Probabilistic Capacity Value of Nonfirm Hydro Energy
Electric utilities with a predominant mix of hydro generation traditionally apply Energy Planning criteria rather than Capacity Planning criteria in developing their generation resources...

Equipment Selection and Site Optimization Based on Energy Considerations
Most new hydro plants contribute little or nothing to overall system capacity. Therefore, traditional evaluation techniques based on dollars per installed kilowatt have no relevance when...

Vilavilani Hydroelectric Project
There is an urgent need to solve the water and energy shortages in the Department of Tacna, on the coast of Southern Peru. The Vilavilani Hydroelectric Project could solve some of the...

Economic Analysis Guidelines?Western Area Power Admin
Guidelines addressing methods and procedures for evaluating benefit and cost components of power projects are being prepared for Western Area Power Administration to use in economic analyses...

Actual Vs. Expected Performance of Small Hydro Projects
This paper presents the results of several case studies of small hydro projects that compare the expected performance with the actual performance as measured in terms of energy generation....

Movable Dam?Gate Selection Procedure
Very few new dams are now being considered, particularly for waterpower and even more specifically for low head waterpower in the lower reaches of major rivers. The City of Harrisburg,...

Small Hydro Power in British Columbia
Water Power '87 will be held in the Pacific Northwest. British Columbia is also part of this region and, as such, is also one of the homes of hydro power. To date, we have...

Mini/Micro Hydro Applications in Remote Off-grid Areas of Ontario
This paper outlines the potential for remote off-grid small hydro development in Ontario and the present incentives that exist to develop these resources. Estimated costs of development...

The Uses of CADD in Hydropower Development
The hydropower community needs inexpensive methods to thoroughly and quickly analyze the siting of hydroelectric projects. Computer-aided design and drafting (CADD) and programs like HYSIZE...

Optimal Design of Small-Scale Hydro Projects
A nonlinear programming model is developed in this study to determine optimal pipe size, the type and number of turbines and the installed capacity for small scale hydro projects. The...

Small Hydro Analysis and Reporting Program
The Ontario Ministry of Energy initiated a project to develop an analysis program based upon metric measures and Canadian costs. The Ministry of Energy of the Province of Ontario has been...

Spreadsheet Applications for Hydropower Developers and Operators
This paper will examine the role of spreadsheet analysis in all aspects of hydropower development. The structure of the presentation will be first to briefly present an overview of the...

The Electric Consumers Protection Act of 1986 Changes FERC Hydropower Licensing
The Electric Consumers Protection Act of 1986 (ECPA) was signed into law on October 16, 1986. This legislation revised and created new ground rules for the processing of hydropower license...

Licensing and Relicensing After the Electric Consumers Protection Act of 1986
Recent changes in the Federal Energy Regulatory Commission (FERC) regulations and subsequent, substantive legislative changes have produced a shift in emphasis in the licensing/relicensing...

The New Environmental Requirements of ECPA
The Electric Consumers Protection Act of 1986 ('ECPA') has imposed significant new environmental criteria on the hydroelectric licensing process under Part I...

Hydro Activities Through the 1990's: Focus on Relicensing
This paper discusses some of the more significant issues facing relicensing applicants in light of the new ECPA amendments to the Federal Power Act (FPA). In addition, some ideas for planning...

A Case Study: Relicensing of Pensacola Hydropower Project
The current license for the Pensacola Hydropower Project (orginally licensed in 1939) will expire in 1988. The relicensing process for the project currently is underway. During the consultation...

Issues in License Compliance and Monitoring
With the language in Section 12 of the Electric Consumers Protection Act ('ECPA') of 1986 (now Section 31 of the Federal Power Act), Congress gave the Federal...

Case Study on the Development of a Hydro License Compliance Monitoring System
As the holder of 29 Federal Energy Regulatory Commission (FERC) licenses, Pacific Gas and Electric Company (PGandE) has an obvious need to monitor and document compliance with the numerous...

 

 

 

 

Return to search