Shop Drawings: In Need of Respect
Engineer Robert L. Boehmig voices his concerns regarding the preparation of structural shop drawings. He gives his view of the shop drawing's role in construction projects,...
Natural Radionuclides in Groundwater From J-13 Well at the Nevada Test Site
The concentrations of U-238 and Th-232 chain members are extremely low in J-13 water, suggesting that their concentrations in groundwaters are largely governed by sorption/desorption processes....
A Numerical Study of Some Effects of Nuclear Fuel Waste Vault Construction and Closure on Evolution of Groundwater Flow Paths in the Geosphere
We have performed a series of three dimensional finite-element simulations on the sensitivity of the groundwater flow paths and travel times in a conceptual hydrogeological model with...
Building of a Conceptual Model at the UE25-C Hole Complex
U.S. Geological Survey and Lawrence Berkeley Laboratory are attempting to construct a conceptual model of the UE25-c hole complex. An interdisciplinary approach is discussed where all...
The Status of the Site Characterization and Validation Program in Phase III of the OECD/NEA Stripa Project
In 1980, the International Stripa Project was organized under the aegis of the OECD Nuclear Energy Agency for the purpose of conducting research, at the Stripa mine in Sweden, related...
Origin of Carbonate Deposits in the Vicinity of Yucca Mountain, Nevada: Preliminary Results of Strontium-Isotope Analyses
As part of the paleohydrology study of the Yucca Mountain Project, strontium-isotope analyses of carbonate deposits, ground water, and major rock reservoirs of strontium are in progress....
Reconnaissance ? ??C and ??8O Data from Trench 14, Busted Butte, and Drill Hole G-4, Yucca Mountain, Nevada Test Site
Trench 14 was excavated to investigate the extent of Quaternary movement on the Bow Ridge fault, a north-south structure on the east side of Yucca Mountain. The trench exposes calcite...
Properties of the West Valley Waste Form
The centroid composition of the West Valley Demonstration Project waste form has been selected on the basis of criteria mandating high chemical durability and good processibility. A review...
Computed Distributions of Residual Shaft Drilling and Drift Construction Water in the Exploratory Facilities at Yucca Mountain, Nevada
The Yucca Mountain Project is studying the feasibility of constructing a high-level nuclear waste repository at Yucca Mountain in southwest Nevada. One activity of site characterization...
Applications of Fracture-Flow Modeling to Site Characterization
This paper describes practical applications of discrete-fracture approaches for design and analysis of groundwater flow about high-level radioactive waste repositories. The paper presents...
Development of a CRUD Particle Size Distribution and Its Effect on Cask Source Term and Containment Analyses
Spent pressurized-water reactor (PWR) and boiling-water reactor (BWR) fuel rods from three reactors were examined by hot cell periscope, energy dispersive x-ray analysis, and scanning...
Lunar Base Power Requirements, Options & Growth
A preliminary study of lunar base scenarios and associated power requirements has recently been completed. Minimum power levels of 50-100 kW are required for 'science-only'...
Challenges and Opportunities in the '90s and Beyond?A U.S. Army Corps of Engineer's Perspective
In the foreseeable future, water resources expenditures will probably be dominated by environmental/water quality concerns. Strong focus is coming to bear on the state of repair, rehabilitation...
Water Resources Infrastructure Review
This paper reviews the three reports forming the basis for the U.S. National Council on Public Works Improvement water resources infrastructure related findings. It also reviews the soon...
Renovating the Riverside Water Plant?A Case Study
In 1986, the City of Waco, Texas began construction of the first of four projects designed to renovate the Riverside Water Treatment Plant. The water treatment plant was originally constructed...
A Design Process for Water Distribution Systems Including Optimization
Design of a water distribution system is a multi-level process from preliminary planning to final detailed sizing of components. Unfortunately as in many design problems, a final detailed...
Upgrading Hydraulic Infrastructure for Level One Redundancy
In the current paper a methodology is presented for upgrading any single source water distribution system in order to provide a level one system redundancy at a minimum cost. A level one...
Optimal Control Strategies for Water Distribution Systems
The overall operation problem becomes one of determining which pumps to run and when to run them so that electrical unit costs and electrical demand charges are minimized while at the...
A Methodology for Optimal Control of Pump Stations
Pumping water to utility customers is an expensive service which consumes large amounts of energy. Most approaches to date require simplifications and assumptions for the specific system...
Predicting Watermain Breakage Rates
Recent studies on water main breakage have shown significant spatial and temporal clustering in the breakage pattern. The methodology described in the paper provides the basis for a prediction...
Return to search