HOV Fix on I-66
Construction has been under way since December 1993 on a project to widen and add a high occupancy vehicle lane on a 12 mi section of Interstate 66 from Route 50 to the City of Manassas...

Computing in Civil Engineering
This proceedings consist of papers presented at the Third Congress on Computing in Civil Engineering held in Anaheim, California, June 17-19, 1996. The proceedings covers advanced computing...

Management of Water Treatment Plant Residuals
Potable water treatment processes produce safe drinking water and generate a wide variety of waste products known as residuals, including organic and inorganic compounds in liquid, solid,...

North American Water and Environment Congress & Destructive Water
This proceedings contains papers presented at the North American Water and Environment Congress '96 of the ASCE's Environmental Engineering Division, Water Resources...

Risk-Based Decision Making in Water Resources VII
This volume, Risk-Based Decision Making in Water Resources VII, comprises edited papers from the proceedings of the Seventh Engineering Foundation...

Advanced Composites Build on Success
Advanced composite materials are competing with conventional structural materials thanks to the ready availability of glass, aramid and carbon fibers, epoxies, vinylesters, polyesters...

Rebound of the Bascule Bridge
A patented bascule bridge in Sheboygan, Wis. demonstrates design innovations that reduce the cost of bascule construction and minimize maintenance problems. The new $7.5 million South...

Probabilistic Mechanics & Structural Reliability
A compilation of over 230 papers, Probabilistic Mechanics and Structural Reliability features the recent advances in probability and statistics...

All-Around Arenas (Available only in Structures special issue)
Structural form and architectural function go hand-in-hand in the design of today's modern multipurpose arenas. The 19th century architect, Louis H. Sullivan, coined the phrase...

Tappan Zee Set for Inverset (Available only in Structures special issue)
Replacing the deck on New York's Tappan Zee Bridge is a ticklish problem, considering that all of the work has to be done at night. A combination of isotropically reinforced...

Seismic Design Doubles Lateral Resistance (Available only in Structures special issue)
A veterans hospital in Palo Alto, Calif. had to be built under severe design constraints. The seismic code for hospitals is among the most stringent of codes and this facility was sited...

Do-Nothing Cleanups
Restoring polluted soil and ground water to pristine condition is, in some cases, neither cost-effective nor feasible. So what's the best way to close these sites with minimal...

Sound Way to Save Fish
Fish protection need not cost an arm and a fin. Using light and sound to spare fragile blueback herring and other species a harrowing fate, the U.S. Army Corps of Engineers devised a fish...

Milwaukee's Ozone Upgrade
After the 1993 outbreak of illness caused by Cryptosporidium in Milwaukee, the city moved forward on an $89 million upgrade of its treatment facilities with ozone filtration, the only...

Who Springs for Water?
Many questions have been raised about the future of water quality and maintenance. The Rocky Mountain Institute has created a report with four scenarios, each based on whether the government...

Modeling Contaminated Sediments
Using a computer model to analyze and predict sediment transport only works when the analyst considers the model's limitations and the physical processes involved, and conducts...

Washington Buildup
Despite its reputation as a city mired in fiscal crisis, Washington, D. C., continues to improve its basic infrastructure. A look at three ongoing projects�a sports arena, a waste water...

Pump and Treat and Wait (Available only in the Geo/Environmental Special Issue)
Pump and treat, a common ground-water cleanup technique, is slow to clean up deep contaminated aquifers. Adaptive intermittent pumping can increase the cleanup rate�and decrease costs�by...

Asphalt-Concrete Water Barriers for Embankment Dams
Because of its simplicity in design and construction, the asphalt concrete core is rapidly becoming the water barrier of choice for embankment dams in many parts of the world. This is...

Evaluation of the Troxler Model 4430 Water-Cement Gauge
Prepared by the Highway Innovative Technology Evaluation Center, a CERF Service Center. This report describes a HITEC evaluation designed to determine...

 

 

 

 

Return to search