Conceptual Cost Estimating: A Hybrid Neural-Expert System Approach
This paper presents a hybrid neural-expert system approach for developing conceptual cost estimates based on historical data of construction projects. The proposed hybrid neural-expert...

An Integrated Computer-Based Total Design Environment for Civil Engineering Education
The nature of design within the professional practice of civil engineering today, combined with the curricular and content requirements for design of the Accreditation Board for Engineering...

Constructors' Approach to CIC Based on Preparation of Construction Production Information
To improve productivity in the construction industry; much research and development is being done - on CAD systems, construction management systems, robotics, computer graphics, etc. Many...

Object-Oriented Finite Element Modeling
The present paper studies the suitability of object-oriented modeling strategies for problems of structural mechanics. After a general discussion of the topic, special emphasis is put...

The Hybrid Solution Approach of ESBE
ESBE is the hybrid object-oriented expert system for the optimization of construction site layout. The task is the dimensioning and the arrangement of the individual construction site...

An Entity Relationship Model of Construction Project Data
The purpose of this paper is to demonstrate the results of applying techniques of information systems development to an application area that is diverse and complex but which is exploring...

An Automated Database System for Construction Bidding
A number of probability-based bidding models have been developed to assist a contractor in preparing bids that improve chances of winning over the competition. Models based on utility...

Adaptive, Multi-Resolution Modeling of Construction Plans
The process of developing a construction plan is complex, taking many considerations and constraints into account. In contrast, the CPM paradigm of planning allows only the results of...

An Effective Estimate of the Percentage Completion of Construction Projects and Concomitant Progress Payments
This paper will discuss the methods of assistance to contractors in visualizing the effects of variations in the quantities of their work and how to obtain such information effectively....

Filing of Construction Photos Linked with Database
In order to raise the added value of construction information, a filing system of construction pictures is built up and is used theoretically linked with a database. Here, conditions set...

Design Information Hierarchy for Construction Method Selection Process
The Construction Project Planning (CPP) stage is a critical stage for the success of a construction project. This stage lays the framework upon which most of the construction decisions...

Optimum Design Software Package for Shortening Civil Engineering Construction Period
The optimum software package for engineering network has adopted a coverage technology to facilitate an analysis of large-sized projects. This package has the following functions: (1)...

Construction Enterprise Management Computer-Aided Diagnosis Technique
Due to the problem existed in the traditional management consulting of construction enterprise, the author has developed the MCAD (Management Computer-aided Diagnosis) technology which...

Quality Control and Constructability of Slabs on Grade With Expert Systems
Constructability and quality control problems associated with the construction of slabs on grade are many. They vary from problems associated with cracking, scaling, dusting and spalling,...

Design and Construction Support with Object-Oriented Database Kernel Systems
The heterogeneity of tools and their data models in civil engineering is a well known problem. Next generation database technology seeks to offer solutions for the integration of the design...

An OOP Model for Scheduling of Repetitive Projects
Repetitive projects are characterized by the presence of large number of repetitive activities, along with a number of non-repetitive activities. Each of thee two types of activities requires...

Exchanging Layout and Schedule Data in a Real-Time Distributed Environment
Unpredictable site conditions and unforeseen changes in construction work may result in inefficiencies due to a shortage of work space and difficult access to critical areas on site. This...

Real-Time Position Measurement Integrated with CAD-CAE and Related Data Structure Issues
The Civil Engineering Research Foundation (CERF), Bechtel Corp. (Bechtel), Jacobus Technology, Inc (Jacobus), and Spatial Positioning Systems,Inc. (SPSi) have formed the Consortium for...

An Application of Neural Networks to Hysteretic Modeling of Steel Structures
This paper describes an application of the neural networks to realistic hysteretic modeling. The neural networks learn from sample data (training cases) and make predictions for new cases....

Computer Assisted Conceptual Structural Design of Steel Buildings
The design quality of a building is mostly determined during the conceptual design stage. Computers, however, have not been used effectively to handle the conceptual design of building...

 

 

 

 