Digital Data Acquisition and Performance Testing of Hydroelectric Equipment
The U.S. Army Corps of Engineers Hydroelectric Design Center has elected to use digital data acquisition methods when conducting performance tests of hydroelectric units. Transducers have...

Renewal of the Burt Dam Generating Station
The present redeveloped hydro facility operates as a 300 kW run-of-river station automated by a head pond level controller which adjusts turbine setting to match available river discharge....

Turbine Conceptions for Low Heads and Their Application in US Hydro Power Stations
To improve the feasibility of small power plants standardized units were developed. The bulb turbine technology as well as the pit-type conception improve the feasibility of larger plants....

Quick Response on the Mississippi
In November 1987, the Mississippi River broke through the foundation of the St. Anthony Fall's Lower Dam Hydropower Plant. The plant's owner, the Northern State...

Waterpower '89
The 1980's have been characterized as an era of uncertainty for world energy including future demand for energy, fuel prices and availability, regulatory constraints, environmental...

Civil Engineering Guidelines for Planning and Designing Hydroelectric Developments
Civil Engineering Guidelines for Planning and Designing Hydroelectric Developments was prepared under the auspices of the Hydropower Committee...

Reflections on Design of a Turnkey Hydro-Power Project?Calaveras, California
Developing the Calaveras project under a turnkey agreement has shown that: (1) some 2 years can be saved, (2) cash flow for the owner is significantly delayed, because engineering is first...

Private Owner Expectation of the Resident Engineer
Traditional project goals invariably distill to achieving a high quality project that is on time and within budget. In meeting these goals, todays resident engineers must do far more than...

Licensee Tort Liability and Regulatory Overreaching
Certain of the Federal Energy Regulatory Commission's (FERC) regulations and licensing requirements effectively preempt the states' authority to determine liability....

Energy from the Amazon
Cadman describes Brazil's plans for exploiting the vast hydroelectrical potential of the Amazon Basin, placing them within the context of the country's growing...

Future Hydropower Development
Hydropower development and management in an era of uncertainty is the theme of this Waterpower '87 conference and reflects the current mood of the U. S. hydropower development...

Waterpower Development: A Renewed Partnership
Efforts to meet the water supply and energy needs of the country in a changing economic, environmental, and technical environment create new opportunities for joint action by water and...

The Outlook for the Hydro Business
Hydropower business activity has grown in the eight years since the WATERPOWER conferences began in 1979. During this time, however, small hydro has faced many ups and downs. Relicensing...

The Pacific Northwest Rivers Study: Development of a Rivers Inventory and Analysis System
To minimize conflicts between hydropower development and resource conservation, the Bonneville Power Administration and the Northwest Power Planning Council initiated the Pacific Northwest...

Hydropower Development for Hawaii
A site specific, evaluation technique is being studied to examine hydropower potential based on an operations research approach for micro- and mini-hydropower systems under established...

Hydropower Development of the Hongshuihe, China
Power is the predominant factor in the development of the Hongshuihe River. The Province of Guangdong is the most highly developed area in the Pearl River Basin, where the fast growing...

Sri Lanka's Mini-Hydro Rehabilitation Programme
As part of Sri Lanka's medium term investment programme funded mainly by the World Bank and Asian Development Bank, the British Government's Overseas Development...

Hydro Development on the Huallaga River in Peru
The proposed Chaglla Hydroelectric Project, is located on the Huallaga River in Central Peru, about 300 km north east of Lima. The available gross head of 870 m and regulated flow of 58...

Small Hydro Studies in Northern Thailand
As part of the Thai Government's programme of rural electrification, Balfour Beatty Engineering (BBE) has been assisting the Provincial Electricity Authority (PEA) in the...

Pumped-Storage Project Site Selection
The paper presents a case history in the selection of a site for a large pumped-storage project for Oglethorpe Power Corporation. The case history illustrates how a large number of potential...

 

 

 

 

Return to search