Practical Experience in the Probabilistic Based Management of Large Water Resources Systems
Probabilistic tools to assist with the management of large water resource systems in South Africa were developed and applied during the last decade. Acceptance today is not only due to...

Urban Wetlands for Multi-Disciplinary Stormwater Management
The evaluation of a stormwater management wetlands facility, from conceptual planning stages to final construction and operation, involves the interaction of many disciplines and agencies....

Computing in Civil and Building Engineering
This proceeding consists of papers presented at the Fifth International Conference on Computing in Civil and Building Engineering held in Anaheim, California, June 7-9, 1993. The proceedings...

Getting Along: The Geotech and the CM
The opinions of geotechnical engineers are usually respected within a consulting firm, but when such a specialist gets out in the field, he or she is seen as merely part of the backup...

Computer Scheduling and Construction Specs
As recently as the early 1980s, employing computers in critical path method (CPM) scheduling was a formidable decision demanding considerable commitment of time and resources by management....

Short-Span Bridge Solutions
Large bridges get most of the headlines, but the nation's huge network of small bridges (many with spans of less than 25 ft) may be more in need of replacement. Age, corrosion,...

Closing the Loop
The 5.1 mi Cooper River Bridge, the longest in South Carolina, completes the I 526 Mark Clark Expressway around Charleston. It is a two-way, four-lane structure with the capability of...

London Linkage
Although it measures just 1.8 km, the Limehouse Link tunnel in London is both a complex engineering project and a gateway to urban renewal. The link is a $350 million highway tunnel connecting...

Issues in Balancing Environmental Costs and Benefits in Water Resources Planning
Water projects differ in their physical and economic characteristics and their environmental impacts. Many environmental impacts are addressed through project design and these associated...

Simulation of Subsurface Drainage of Highway Pavements
An analysis of the drainage of a pavement system from initial saturation incorporates a realistic assessment of the drainable porosity of the base. This analysis indicates that if a granular...

Bridge Scour Analysis in New Jersey: Which Scour Factors Matter Most?
This paper seeks to correlate the scour susceptibility of bridges with such observable characteristics as bridge design features, waterway characteristics, and geographic and geologic...

Preliminary Studies of Pressure Flow Scour
Bridges that become inundated during floods have slightly pressurized flow that impacts bridge piers and creates an aggravated scour condition. Results of two preliminary laboratory studies...

The Influence of Exposed Footings on Pier Scour Depths
Data compiled from past test efforts are combined in this article with the results of two new flume test studies. The combined material, presented graphically, suggests a method for adjusting...

The Influence of Protective Material on Local Scour Dimensions
Protective materials installed around the base of a bridge pier can reduce or prevent local scour. The performance of four materials: grout mats, grout bags, footings, and riprap, are...

Tetrapods as a Scour Countermeasure
Few materials have been studied for their effectiveness in protecting bridge piers and abutments from local scour other than riprap. Recent research conducted at the FHWA research facility...

Threats to Bridge Stability from Scour Related Failures of Drop Structures
Catastrophic failure of bridge foundations may occur when channel bed elevations are lowered unexpectedly. Bridges to be constructed in channels that are known to have bed degradation...

Riprap Coverage Around Bridge Piers
Experiments were conducted to examine the effect of riprap size and coverage on reducing local scour at bridge piers. Pier diameter, bed material size, riprap size and diameter were varied...

Overmining Causes Undermining(It's a Mad Mad River)
Instream aggregate mining has caused significant problems and expense to California bridges. Riverbed degradation on the order of 3-5 m (9-15 ft) beneath waterway crossings within actively...

Using Geophysical Data to Assess Scour Development
The development of scour holes in the Connecticut River near the new Baldwin Bridge has been documented by comparing geophysical records collected before (1989), during (1990), and after...

Uncertainty of Bridge Scour Estimates
Pier scour is the erosion of a streambed in the vicinity of bridge pier foundations. In this paper, fuzzy regression is used to develop two pier scour models, one based on crisp laboratory...

 

 

 

 

Return to search