Nine Years' Service with Deep Polymer Impregnation
A test installation of deep polymer impregnation was applied to a heavily traveled bridge deck in Bethlehem, Pennsylvania, in 1975. The deep polymer impregnation process involved drying...

Analysis of Cracking of I79 Bridge at Neville Island
A large crack was discovered to form in a girder of the I-79 Glenfield Bridge over the back channel of the Ohio River near Pittsburgh on January 28, 1977. A section of the girder containing...

Transmission Tower Foundations in Weathered Rock
A case history is presented which discusses the siting, design and construction of the tower foundations for a transmission line in southwest Alaska. The project, completed in 1983, consists...

Clearing the Decks
Cathodic protection, an electrical-chemical process that prevents corrosion of steel rebars on bridge decks, is rapidly gaining acceptance by highway engineers and state highway departments....

New Cables for Old
In an eingineering first, the main suspension cables will be replaced on New York City's Williamsburg Bridge without closing it to traffic at any time. According to the design...

Applications of Microcomputers for Bridge Design
This paper examines the role of microcomputers in the design divisions of state departments of transportation, specifically in bridge design applications. Consideration is given primarily...

Tunneling a Bridge
Linking an addition to the Georgia World Congress Center in Atlanta required a pedestrian tunnel through a railroad embankment 100 ft wide and 40 ft high, with no disruption of train service...

Advances in Short Span Steel Bridges
Applying recent research to the design of short span steel bridges can lower their cost and maintenance. Such research involves improved limit state criteria, more uniform lateral load...

Jointless Bridge Decks
Deck joints in a bridge are the source of many problems over its lifetime. In time, chances are good the joint will leak, permitting water and salt to leak through. Often this leads to...

Redecking with Precast Keeps Traffic Moving
The Woodrow Wilson Memorial Bridge in Washington, D.C. could not be closed to traffic while a new deck was constructed. The engineers designed a precast prestressed and post-tensioned...

Rail and Road Traffic Continue During Bridge Modification
The crossing of Route 15 under the Bangor and Aroostook Railroad Bridge, Bangor, Maine had limited sight distance and marginal clearances. Maine Department of Transportation, therefore,...

Steel Girder Bridge Sets Record Length
The Veterans Memorial Bridge at Ottawa, Ill., is the longest plate girder, stringer type bridge in the country with spans of 385, 510 and 305 ft. Value engineering played an important...

The Case of the Bungled Bridge Rehab
Foundation failures and rehabilitations concern the owner, the engineer and the contractor. These parties face liability to one another as well as to third parties. There are contractual...

Engineering Liabilities for Design of a Bridge That Failed During the San Fernando Earthquake
On February 9, 1971, the San Fernando Valley in Southern California experienced a major earthquake. Among the victims were two men who were killed when a bridge connector ramp of a newly...

Seismic Design for Highway Bridge Foundations
This paper focuses on the determination of stiffness characteristics of piles and pile groups. Both battered and vertical pile groups are considered. Recommended methods for determining...

Seismic Design for Sacramento Light Rail Transit System
The Sacramento Light Rail Transit Project is an 18. 5 mile system which provides the trunk line service for an integrated Bus/LRT public transportation system. Seismic design utilized...

Base Isolation Concepts for Seismic Bridge Retrofit
Failures in past earthquakes have indicated three major problem areas with existing bridges. The first is the vulnerability of existing rocker and roller type bearings and this is coupled...

CSMIP Strong-Motion Instrumentation and Records from Transportation Structures?Bridges
Seven transportation structures have been instrumented by the California Strong Motion Instrumentation Program (CSMIP), including four bridges. Records (in excess of 0. 25 g maximum acceleration)...

Intermountain Power Project Seismic Design
Coal-fueled generation units of the Intermountain Power Project are constructed in a seismically active area of Utah (UBC Zone 3). The seismic design criteria were published during the...

Bridge
Named Outstanding Civil Engineering Achievement of the Year, the Luling-Destrehan Bridge across the Mississippi River, twelve miles north of New Orleans, has a 1,222 ft. main span that...

 

 

 

 