Prediction of Gravel Bedload with SAM
Bedload measurements for Little Beaver Creek in Colorado were used to test the sediment transport functions included in SAM. The test results showed that Toffaleti predicts total bedload...
Procedures for Evaluating the Effects of Sedimentation on Flood Hazards in Urbanized Areas in the Southwestern U.S.
Urbanization of watersheds in the arid Southwestern U.S. creates problems for resource agencies and design engineers. Traditional analytical techniques that are generally applicable to...
Modeling Flow in Variably-Saturated Porous Media
An expression for effective hydraulic conductivity to solve groundwater flow problems is developed. Also, a refined Monte Carlo (MC) simulation procedure is proposed. The developed methodologies...
Simulating Water Supply Systems of the Raritan Basin
A recently developed interactive river-aquifer system model (IRAS) was used to study the Raritan River Basin as part of the effort to revise the New Jersey Statewide Water Supply Master...
Nakajima Subsurface Dam
A new water resource is generated by a subsurface dam. This paper presents the design, construction, and monitoring of a test subsurface dam in an alluvial valley of an island for both...
Public Involvement in Water Resources Management
Some thoughts on the use of public involvement, partnering, customer focus, and decision support systems in water management are presented....
Considering Uncertainties in Water Resource Designs
Design of water resource systems often faces with various uncertainties. The nature of problems in essence are decision making under uncertainties. This paper offers an introduction to...
Designing Under Uncertainty When We Can Reduce Uncertainty: When is Another Observation Worth the Cost?
A method is presented that optimizes the selection of sites for observation of an uncertain parameter when that parameter is used in the risk-based design of an engineered system. The...
Convergence and Divergence Between Regulated Riparian and Prior Appropriation Provisions in the ASCE Model State Water Rights Code
Although there are two major American water rights systems-- riparian and prior appropriation--there are mixed systems and variations within each major type. The ASCE Model State Water...
Balancing Water Allocation and Water Quality: The Model State Water Code
The Model State Water Code (hereafter called the 'Code') currently being developed by an ASCE task committee is intended to provide a source of legal norms of water allocation for use...
Water Resource Modeling and Consensus Building
The steps undertaken to develop consensus with respect to analyzing a complex and competitive water resources/water rights situation through the development of a simulation model are described....
A Nested-Model Approach to Investigate Climate Change
Determination of the spatial and temporal distribution of precipitation in mountainous regions is critical for assessing the effects of climate variability on water resources in these...
Atmospheric Circulation and Snowpack in the Gunnison River Basin
Winter mean 700-millibar height anomalies over the eastern North Pacific Ocean and the western United States are related to variability in snowpack accumulations measured on or about April...
Statewide Consumptive Use Estimates
Methodology for estimating consumptive use and consumptive irrigation requirements on a statewide basis is summarized. The methodolgy has been used to update monthly and seasonal consumptive...
Climate Change Impacts on Boston's Water Supply
The analysis of the climate sensitivity of the water supply system of the Boston area indicates that the water supply has the potential to be dramatically altered by global warming. The...
Recreating a Process: The West Georgia Regional Water Supply Plan
This paper describes the planning process used to develop a long-range water supply plan for a five-county area northwest of Atlanta, Georgia. Demand for water in the study area is projected...
Water Policy and Management: Solving the Problems in Southern New Jersey
Southern New Jersey, which has relied solely on groundwater to satisfy its water supply needs, is depleting the primary source for that water. Symptoms of this depletion include declining...
Water Policy Change, Implications for Pyramid Lake
Pyramid Lake is part of and is surrounded by the Pyramid Lake Indian Reservation. The river system has been administered by a Federal water master serving the Federal court system with...
Understanding the Uses of History in Water Resources Planning and Management
Understanding how water resources decisions (technical, regulatory, structural, or managerial) have been made is necessary to provide the water industry with a perception of complex human...
Addressing Central Valley Project Policy Issues Using a General-Purpose Model
The U.S. Bureau of Reclamation's Central Valley Project (CVP) in California is constantly undergoing changes in legal mandates and policy objectives. Due to the complex nature of existing...
Return to search